Laserfiche WebLink
TABLE II-B-App 7-Att 3-1* <br /> DRAINAGE SUB-BASINS FOR PREPARATION PLANT AREA <br /> Estimated <br /> Time of <br /> Sub-basin Drainage Channel Highest Lowest Average Concentration <br /> Number Area Length Elevation Elevation Slope (Min.) <br /> (1) Acres) Ft.) (Ft.) (Ft.) M (2) <br /> 1 2.00 450 8050 8040 2.2 15 <br /> 2 2.25 450 8145 8115 6.7 15 <br /> 3 10.54 1150 8150 8045 9.1 15 <br /> 3A 7.51 1400 8050 7940 7.9 15 <br /> 4 10.75 1300 8220 8175 4.5 15 <br /> 5 10.95 850 8125 8055 8.2 15 <br /> 6 2.07 280 8125 8085 14.3 15 <br /> 7 1.93 600 8225 8155 11.7 15 <br /> (1) See Plate I <br /> • (2) Adopted 15-minute minimum <br /> *See revised chart on page 21 of this section. <br /> 12 <br />