My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (163)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (163)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:16:37 AM
Creation date
5/20/2008 11:22:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Mine Portal Areas Drainage and Sediment Control Plans
Section_Exhibit Name
Chapter II Attachment 1 to Appendix II-B-7
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO RI HARD D. LAW. Gnvcrnnr <br /> DEPARTMENT OF NATURAL RESOURCES <br /> Harris D. Sherman. Executive Director <br /> T Ill ATION <br /> -IN AN EC ME, I ED L , D 1A <br /> 4(23 Centennial Building, 1313 Sherman Street <br /> A. Denver,Colorado 80203 Te.l. (303) 839-3567 <br /> Hamlet J. Barry, 111, <br /> Director <br /> May 19, 1980 <br /> Mr. Doug Bowman RECEIVED <br /> Mid-Continent Resources, Inc. <br /> P. 'O. Box 158 DEC 11987 <br /> Carbondale, Colorado 80623 MINIED LAND <br /> RE: Coal Basin Mines - Drainage & Sediment ControiRfWMATION DIVISION <br /> mines 1, 2, and 5 <br /> Our File: #77-419 <br /> Dear Doug: <br /> As you are aware, the Board at their April 23, 1980 meeting, delegated to <br /> the staff the authority to approve the drainage and sediment control plans <br /> for 'Mines 1, 2, and 5 when such plans were considered adequate. Based on <br /> the initial plans for Mines 1 and 2 submitted December 28, 1979, and responses <br /> to a staff adequacy letter received April 11, 1980 and May 8, 1980, the <br /> Division is now in a position to make a finding of compliance with all <br /> applicable regulations and as such is giving approval to the drainage an.d <br /> sediment control plans for Mines I and 2. <br /> With respect to Mine 5, there is still some confusion with the overflow <br /> diversion system discussed on Page 5, Item 7 of Brook Wilson's May 3, 1980 <br /> letter (the maps for Mine 5 and the haul road drainage system don't agree) . <br /> Additionally, addenda sheets A-r, A-5 and A-6 referenced in the May 5, 1980 <br /> letter was not included. At such time as these discrepencies are solved, the <br /> Division will also be prepared to approve the drainage and sediment control <br /> system for Mine 5. <br /> The plans for Mine 1 and 2 will be presented to the Board for ratification <br /> of Division approval at the May 29, 1980 Board meeting. <br /> Please call if you have any questions. <br /> Sincerely, <br /> Dean R. Massey <br /> Supervising Reclamation Specialist Coal <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.