Laserfiche WebLink
STOiLM CU:.A7ERTS <br /> Three prcposed storm culverts will cross the haul road as shown on <br /> • plans. These 3 culverts are at the following locations: <br /> 1. Kine Pad 1 <br /> 2. Mine Pad 2. <br /> 3. Pad 4 (Lumber Yard) <br /> Bedding details shown on Plate 3 for placement of storm sewer apply <br /> to culvert placement. <br /> These culverts are in addition to the 17 culverts recommended for <br /> the haul road system. <br /> EART,gi BER.;SS AT MINE nIG iTRALLS <br /> Separation of overland flows developed on undisturbed areas from the <br /> runoff on the Mine Pad areas is accomplished by constructing 1 to 2. f eet <br /> high earth berms at the toe of the highwall. (Plate 3) . <br /> _7_ <br /> 31 <br />