Laserfiche WebLink
r <br />Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year 2007 <br />SOUTHFIELD C-81-014 ENERGY FUELS COAL INC <br />mine name permit # Permittee <br />Address: 10390 BRADFORD ROAD STE 205 LITTLETON CO 80127-6416 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Cate o Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed 105.8 + 0.0 = 105.8 <br />Acres backfilled and raded 82.1 + 0.0 = 82.1 <br />Acres to soiled incl reseeded 82.1 + 0.0 = 82.1 <br />(8.5 acres are Included In the Permanent Facilities category). <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total ear Total' less ears' <br />Acres seeded" 82.1 + 0.0 = 82.1 = 45.7 + 36.4 <br />m~iuue, ~r necessary, a aescnpuon or any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 105.8 and the total number of acres: <br />Phase I released 81.8 Phase II released 0.00 Phase III released 0.00 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 8.4 <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z 23.7 <br />Acreage in active mining areas s _0 <br />'(exclude acres where Phase III release has been achieved) <br />z Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; non-backfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and non-coal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />s Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />