Laserfiche WebLink
A; <br />energy fuels coal, inc. <br />southfield mine post office boz 459 florence, Colorado 81228 (719) 784-6395 <br />May 2, 2008 <br />Ms. Janet Binns <br />Division of Reclamation, Mining & Safety <br />1313 Sherman Street -Room 215 <br />Denver, Colorado 80203 <br /> <br /> <br />Divisw,. ~, .,~~,ama~on, <br />Mining and Safety <br />L1 <br />Re: Kerr Coal Company -Marr Mine and Loadout <br />Permit No. C-80-006 <br />2007 Annual Reclamation Report <br />Dear Ms. Binns: _ _ .~ _ . ~.. .._ _.. .. --- <br />The letter report represents the Annual Reclamation Report (ARR) for the year 2007 for the Kerr <br />(Marr) Mine located near Walden, Colorado. The following summarizes site maintenance and <br />reclamation activities that occurred at the Marr Mine and at the associated Loadout during the <br />year 2007. Kerr relinquished the federal coal lease for the northern portion of the mine property <br />(north of County Road 12E) in July of 2002. <br />Active mining and related activity was suspended and final reclamation activities were initiated <br />in early 1993. Final reclamation of most mine disturbance areas was completed during the <br />period from 1993 through 1996. Disturbance areas reclaimed in 1999 included the Loadout <br />Area, a portion of the shop/warehouse facilities pad and the former powder magazine area, soil <br />stockpile area and associated road. All areas reclaimed in 1999, except the Loadout; were <br />initially seeded to the annual rye mulch crop followed by the permanent revegetation seeding in <br />2000. The Loadout was seeded to the permanent revegetation seed mixture in 1999 but due to <br />poor response of the seeding, the Loadout was re-seeded with the permanent mix again in the <br />fall of 2000. Maintenance and repairs for 2007 are described in this report. <br />As part of Keri-'s regular site maintenance activities, surface water control structures were <br />inspected. Any concerns noted by the Division of Reclamation, Mining and Safety (DRMS), in <br />their regular site inspection reports were considered. Based on inspection, the surface water <br />control structures were found to be generally in good condition. The repairs or maintenance <br />activities completed in 2007 consisted of removal of willows from the Tipple Pond emergency <br />spillway and re-grading of the road ditch along the entrance road to the Loadout. <br />In the mine area, Ponds C and G were backfilled, embankments and spillways removed, <br />regraded, re-seeded, mulched and crimped during the previous year, 2006. <br />