My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-15_HYDROLOGY - M1978056
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1978056
>
2008-05-15_HYDROLOGY - M1978056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:36 PM
Creation date
5/16/2008 2:13:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
HYDROLOGY
Doc Date
5/15/2008
Doc Name
Substitute Water Supply Plan
From
DWR
To
Cheryl Signs Engineering
Permit Index Doc Type
Hydrology Report
Email Name
CBM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 <br /> <br /> <br /> MO NTHLY DISTR IBUTION FOR DEPLETI <br /> ON 8 REPLACEMENT RE UIREMEN TS <br /> <br /> DUR HAM <br /> PIT M-78-056 <br /> <br /> <br /> NET LAGGED <br /> <br />EVAP <br />TOTAL <br />TOTAL <br />HEADGATE LAGGED LAGGED ACCRETIONS & RURAL REPLACEMEN <br /> <br />FOR MAX OF <br />EVAPORATIVE <br />EVAPORATIVE <br />DELIVERIES RETURN RETURN DEPLETIONS DITCH LAGGED FROM <br /> <br />12.32 ACRES <br />AND <br />AND <br />5 SHARES FLOWS FLOWS 5 SHARES CONSUMPTIVE RETURN TOTAL STORAGE <br /> <br />OF POND <br />OPERATIONAL <br />OPERATIONAL <br />OPERATIONAL <br />GIC CANAL 5 SHARES FOSIL CREEK OF VARRA'S GIC CANAL REMAINING USE FLOW REMAINING WATER <br /> <br />SURFACE <br />LOSSES <br />LOSSES <br />LOSSES <br />NO <br />3 GIC CANAL RESERVOIR SHARES AT N0.3 REPLACEMEN OF THE 4 SHARES REPLACEMENT IN THE 122 <br /> <br /> <br /> <br />ANUARY <br />FEBRUARY <br />AF <br />1) <br />0.94 <br />1.25 <br />AF <br />(2 <br />1.86 <br />1.73 <br />AF <br />3 <br />2.80 <br />98 <br />2 <br />AF <br />4 <br />2.91 <br />2 <br />99 . <br />AF <br />5 <br />0.00 <br />0 <br />00 NO.3 <br />AF <br />6 <br />1.70 <br />1 DELIVERIES <br />AF <br />7) <br />0.00 FOSIL CREEK <br />AF <br />8 <br />0.08 ND FOSIL CRE <br />AF <br />9 <br />-1.78 REQUIREMENT <br />AF <br />10) <br />4.69 4 SHARES <br />AF <br />11 <br />0.00 RURAL DITCH <br />AF <br />12 <br />-5.00 REQUIREMENT <br />AF <br />13) <br />9.69 LINED PIT <br />AF <br />14 <br />9.69 <br /> <br />MARCH <br />APRIL <br />MAY <br />JUNE <br />JULY <br />AUGUST <br />SEPTEMBER <br />OCTOBER <br />NOVEMBER <br />DECEMBER <br />1.56 <br />1.26 <br />1.63 <br />3.61 <br />4.39 <br />4.17 <br />2.61 <br />1.58 <br />1.13 <br />0.97 <br />1.86 <br />1.62 <br />2.21 <br />2.16 <br />2.74 <br />2.94 <br />2.26 <br />2.42 <br />2.48 <br />2 <br />58 . <br />3.42 <br />2.88 <br />3.84 <br />5.77 <br />7.13 <br />7.11 <br />4.87 <br />4.00 <br />3.61 <br />3 <br />55 . <br />3.38 <br />2.93 <br />3.75 <br />5.52 <br />6.89 <br />7.02 <br />5.08 <br />4.16 <br />3.73 <br />3 <br />60 . <br />0.00 <br />2.57 <br />13.45 <br />17.54 <br />21.40 <br />18.05 <br />13.43 <br />6.74 <br />0.00 <br />0 .60 <br />1.50 <br />1.70 <br />6.30 <br />6.20 <br />6.60 <br />5.80 <br />5.60 <br />3.70 <br />2.00 0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />1.10 <br />3.10 <br />0.70 <br />0.00 <br />0.00 0.06 <br />0.06 <br />0.08 <br />0.08 <br />0.08 <br />0.29 <br />0.69 <br />0.30 <br />0.08 <br />0.08 -1.68 <br />-1.58 <br />0.79 <br />7.07 <br />11.26 <br />15.61 <br />14.66 <br />8.23 <br />2.96 <br />-2.08 4.67 <br />4.96 <br />2.14 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />1.20 <br />5.81 0.00 <br />0.00 <br />5.40 <br />23.30 <br />54.10 <br />84.30 <br />61.80 <br />27.10 <br />9.50 <br />0.00 -4.00 <br />-4.20 <br />-4.10 <br />-7.50 <br />-13.10 <br />-19.70 <br />-15.10 <br />-10.60 <br />-6.60 <br />-6.00 8.67 <br />9.16 <br />0.84 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />11.81 6.67 <br />9.16 <br />0.84 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />11.81 <br /> <br />TOTAL <br />25.10 . <br />26.86 . <br />51.96 . <br />51.96 .00 <br />93.18 1.80 <br />44.50 0.00 <br />4.90 0.08 <br />2.00 -1.88 <br />51.58 5.48 <br />28.95 0.00 <br />265.50 -5.41 <br />-101.51 10.89 <br />51.06 10.89 <br />51.06 <br /> <br /> <br /> <br />1 InGudes 12.32 acres ex sed at Durham Pit site 41.1 acres were ex sed at the site rior to December 31, 1980 <br />2 0 ational losses consist of 20.60 AF ear for water lost with the mined roduct, 2.76 AF ear for dust control <br />and <br />3 <br />50 acre-feet us <br />ed for concrete ba <br />tchin <br /> <br />3 Sum of Column 1 and Column 2. , . . <br />4 La ed usin stream de letion model for the site - <br />5 Prorate deliveries for 5 shares of Greele Irri anon Com an Canal No. 3 <br />6 Prorate return flow obli anon for 5 shares of Greele Irri anon Co. Canal No. 3 <br />Prorate deliveries of Varra's interest in Fosil Creek Reservoir <br />8 Prorate return flow obli anon for Vartra's shares in the Fosil Creek Reservoir <br />9 Column 5 -column 6 -column 8. <br />10 Remainin re lacement uirement to be re laced b shares of the Rural Dkc h Com an <br />11 Rural Ditch Consum five Use Credits of the 4 shares <br />12 La ed return flow for the four shares of the Rural Dkch <br />13 Total remainin re lacements re uirement <br />14 Re lacemerd to be met b story a in the 112 lined it <br /> <br />Durham Pft mordhly distribution and replacements (08-09) <br />
The URL can be used to link to this page
Your browser does not support the video tag.