Laserfiche WebLink
a <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rute 4.05:6(17) <br />Mine: Southfield <br />NPDES ID. No.: CSI 1_oadout Sediment Pond #2 <br />Inspection Period: Fourth Quarter 2007 <br />Inspection Date: January 3.2008 <br />General Description or Reference to Site Plan: <br />This pond is Located at the west end of the remote coal loadout faafity. The facility is inactive. <br />EMt3ANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />3). is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />4). Erosion of the downstream toe of the embankment? <br />Cause of evasion can be attributed fio: <br />Yes <br />i <br />I <br />No L', ~ <br />No t~-- <br />No <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />Yes No <br />PRINCIPAL SPILLWAY <br />1). is the principal spillway system in working order? <br />2). is the inlet free of debris and restridive material? <br />3). Is the discharge outlet free of restrictive. material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />F~ccellent ~ M"Ntoder~ Few Poor <br />~. _..`.. <br />Extensive Some ~`~'~ None <br />Yes <br />Yes <br />Yes G-' <br />Yes v' <br />Yes «- <br />Yes <br />Just starting None <br />No i <br />No <br />I <br />No ~ <br />I <br />Nov~'~ <br />Page 1 of 2 <br />