My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-14_HYDROLOGY - C1981014
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981014
>
2008-05-14_HYDROLOGY - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:33 PM
Creation date
5/16/2008 11:27:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
HYDROLOGY
Doc Date
5/14/2008
Doc Name
1st Quarter 2008 Pond Inspections
From
Energy Fuels Coal Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspect
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.6(17} <br />i <br />Mine: Southfield <br />NPDES ID. No.: Pond #5 <br />Inspection Period: First Quarter 2008 <br />Inspection Date: Apri116, 2008 <br />General Description or Reference to Site Plan: <br />This sediment control pond lies north east of the main facilities area. All drainage from the <br />reclaimed mine foci{ides area is directed fio this-pond. The primary discharge gate has been disabled <br />in the open position, ensuring that the-pond functions as a "pass-through" faaTity. <br />EMBANIaIlIENT <br />1)_ Adequacy of the vegetative cover. <br />2). Erosion fomning Gullies: <br />r~_~...ye. -. <br />Excellent ~ 11Aodera , Few Poor <br />Extensive Some ~ .None <br />3). Is wave action. causing erosion: <br />On the Ups6ream embankment? Yes ~ No <br />At the principal spillway inlei? Yes . No v <br />No <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attrrbuuiteed to: <br />5). Is seepage oca~rring through the dam? Yes No t~ <br />Could this seepage cause potential instability? <br />,I <br />PRINCIPAL SPILLWAY <br />1). Is the prinapal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />~~ <br />Yes y-- No <br />i <br />Yes ~-- No <br />I <br />Y~ j~ No <br />Yes No ~' <br />Just starting None ~ <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.