Laserfiche WebLink
-6- <br />~/ ~~ 2. "Che Board may suspend or revoke this permit, ar assess a civil penalty, upon a finding that the permittee <br />violated the terms or conditions of this permit, the Act, the Mineral Rules and Regulations, or that information <br />contained in the application or your permit misrepresent important material facts: <br />~i ~ ~ 3. If your mining and reclamation operations affect areas beyond the boundaries ofan approved permit boundary, <br />substantial civil penalties, to you as permittee can result; <br />/~+ J ' 4. Any modification to the approved mining and reclamation plan from those described in your approved <br />application requires you to submit a permit modification and obtain approval from the Board or Office; <br />/~~ S, S. It is your responsibility to notify the Office of any changes in your address or phone number; <br />~, S. 6. Upon permit issuance and prior to beginning on-site mining activity, you must post a sign at the entrance of the <br />mine site, which shalt be clearly visible from the access road, with the following information (Rule 3.1.12}: <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined band <br />Reclamation Board; and, <br />~' c. the permit number. <br />~-J, 7. The boundaries of the permit boundary area must be marked by monuments or other markers that are clearly <br />//~~ visible and adequate to delineate such boundaries prior to site disturbance. <br />'v,-s. 8. It is a provision of this permit that the operations will be conducted in accordance with the terms and conditions <br />listed in your application, as well as with the provisions of the Act and the Construction Material Rules and <br />~ Regulations in effect at the time the permit is issued. <br />~C/, S 9. Annually, on the anniversary date of permit issuance, you must submit an annual fee as specified by Statute, <br />and an annual report which includes a map describing the acreage affected and the acreage reclaimed to date (iftherc <br />are changes from the previous year), any monitoring required by the Reclamation Plan to be submitted annually on <br />the anniversary date of the permit approval. Annual fees are for the previous year a permit is held. For example, a <br />permit with the anniversary date of July 1, 1995, the annual fee is for the period of July 1, 1994 through June 30, <br />1995. Failure to submit your annual fee and report by the permit anniversary date may result in a civil penalty, <br />revocation of your permit, and forfeiture of your financial warranty. It is your responsibility, as the perTnittee, to <br />~~ continue to pay your annual fee to the Office until the Board releases you from your total .reclamation. responsibility. <br />~i..~., 1€i. Ic~c jutrtt venturerta_a_.rlnersl~~ cl~r~ratprs; th.e sig.~ting representative is authorised to sum this dcicument and a <br />pcicuer of atttrno; (provided by the partner(s)} autlt~~ririi:~g th.e si.t~,ature of the representatE:v is attached tc> tlii.s <br />applicati.o s. <br />