Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 State :Colorado PermiUjob# :M-2008-014 <br />Date <br />User <br />04/30/2008 <br />BMK <br />Abbreviation :none <br />Filename :M014-002 <br />Agency or organization name :DBMS <br />Permit or other job action :NEW APPLICATION <br />Task description :APPLY 12 INCHES OF TOP SOIL OVER 10 ACRES <br />HOURLY;.E .;:.;:.; :................................................................................................................................................................................... <br />......................................... <br />QUIPMENT COST <br />Basic machine :Cat D8R Series ll - 8U (2005) <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :1-shank ripper <br />Horsepower : 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $58.31 NA <br /> Operating cost/hour : $77.43 100 <br /> Ripper op. cost/hour : $3.40 40 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $171.91 Total fleet cost/hour : $171.91 <br />MATERIAL:::::UANT :::....................... <br />Q ITIES ....................................................... ................................................................... .......................... .................................. <br />Initial Swell Loose <br />volume : 16,133 CCY factor : 1.125 volume : 18,150 LCY <br /> <br />Source of estimated volume :EXHIBIT E <br />Source of estimated swell factor :EXHIBIT E <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 400.0 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiff/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-r~ <br /> Push gradient : 1.02 (Cat HB) <br />Average push gradient : 1.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,700 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.50 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 198.39 LCY/hr <br /> Adjusted fleet production : 198.39 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 91.49 Hours <br />Unit cost : $0.867 /LCY Total job cost : $15,728 <br /> <br />County :Kit Carson <br />Site : Halde Pit <br />