Laserfiche WebLink
Memorandum in Response to Notice of Determination of Designation Mining Operation (DMO); DRMS File Numbers <br />M-1977-416, M-1978-039 HR, M-1977-285, M-1980-055 HR, M-1981-021 and M-1977-032. <br />• CDPHE Air Permit for the Sunday Mines, inspection and reporting <br />requirements. <br />• The EPA's NESHAPs monitoring and reporting requirements for radon <br />emissions from mine ventilation systems. <br />• Monitoring and reporting requirements for the Mine Safety and Health <br />Administration (MSHA) to ensure protection of worker health and safety at <br />the Mine sites. <br />• San Miguel County's approval of any Septic Systems in use at the Mine sites. <br />• San Miguel County's Special Use Permit requirements. <br />• San Miguel County's Road Use Permit requirements.4~~;~~~. <br />ry~~~~:~c-~i <br />• BLM Plan of Operations and NEPA decision records and findings of no <br />•u~~= <br />significant impact (when finalized). This would~mc'lu de wildlife, cultural, <br />paleontological assessments of potential impacts, mitigation requirements and <br />best management practices used to ensure:that'the mine'toperations are <br />protective of human health and the environment and that mirie;activities do <br />not cause unnecessary or undue degradation of federal lands '~`~"-~_ <br />• Monitoring and reporting requirementsfor the Department of H~rneland <br />,__ ,:~,._ ~ ,~,K.. <br />Security for explosives used in mining operations (potentially confidential <br />information). - <br />• State Engineers Office underground water use ~mgnitoring requirements. <br />Section 6.4.20 (4) -Denison will provadeyother~permits and licenses identified above <br />in Section 6.4.20 (3). -- ~`='`"`~° ~`~ <br />Section 6.4.20 (S) .:-~~Derisori~~sdoes not use~chemicals yin processing at the mine sites; <br />therefore an evaluation of designated chemicals will not be provided. <br />Section 6.4.20 (6) D:emson_~will provlde reclamation procedures for waste rock piles <br />based on,the findings of th~e~AMD andyM~WMP testing and meetings with the <br />Division if addirion ~4proteetion than what is currently provided in existing permit <br />doeuLments is requlred,,µIf the~data`~analysis leads to a requirement for new <br />-~:. <br />construction at the mme~sltes, then a QA/QC plan will be prepared for this new <br />_, __.., <br />Section 6.4:2.0~~7) - De_n. son will provide a facility evaluation based on site specific <br />conditions obtained-~n~Phase 1. This will include information from the site specific <br />drainage reports for the engineered surface water protection measures. <br />Section 6.4.20 (8) -Denison will provide groundwater information as discussed above <br />in the hydrogeologic reporting obtained in Phase 1. <br />Section 6.4.20 (9) - If appropriate and available, Denison will provide groundwater <br />data based on the information obtained in Phase 1. <br />Section 6.4.20 (11) -Annual rainfall at all of the mines is minimal, and surface water <br />sampling would be difficult to obtain. However, if possible, surface water samples <br />will be collected from mine permit boundary discharge points. <br />7 <br />