My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-05_PERMIT FILE - M2008027 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008027
>
2008-05-05_PERMIT FILE - M2008027 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:29:08 PM
Creation date
5/6/2008 8:27:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008027
IBM Index Class Name
Permit File
Doc Date
5/5/2008
Doc Name
110c permit application
From
Black Diamond Minerals, LLC
To
DRMS
Email Name
CBM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
110 Permit Application Colorado Division of Reclamation. Mining and Safety <br />(B) Rule: All items referenced in the Reclamation Plan must be included in the cost <br />calculation. These items in addition to earthwork, such as building demolition, fencing, <br />monitoring well sealing or stream channel reconstruction must also be included in the <br />reclamation cost estimate. <br />Response: All items in the reclamation plan are included in Table 2. <br />(C) Rule: After the direct costs noted above have been estimated, the Office may add up to <br />an additional maximum 18.5 percent of that total, which includes private contract, typical <br />overhead costs. This additional cost is required to cover indirect costs that an <br />independent contractor would incur when performing reclamation of the site. Five <br />percent additional cost shall be added to cover Office administration cost in the event of <br />bond forfeiture and permit revocation. <br />Response: The applicant acknowledges the Division's need to add up to an additional <br />18.5 percent of the estimated third party reclamation costs for private contract, typical <br />overhead costs and an additional 5 percent cost to cover Division administration in the <br />case of bond forfeiture and permit revocation. <br />Table 2. Tepee Park Ranch Shale Rorrnw Pit Rpr_lamatinn Rnnri Fctimata <br />ITEM Unit Price Units Quantity Total <br />Mobilization/Demobilzation $1,500.00 each 1.0 $1,500.00 <br />410 Backhoe $95.00 hour 16.0 $1,520.00 <br />Trackhoe $140.00 hour 16.0 $2,240.00 <br />Seed mix $200.00 acre 0.7 $132.00 <br />Laborers $30.00 hour 30.0 $900.00 <br />Erosion Control Mat $3.00 square and 1070.0 $3,210.00 <br />Silt Fence $2.00 linear foot 330.0 $660.00 <br />Miscillaneous Materials $500.00 lump sum 1.0 $500.00 <br />Straw Mulch $250.00 acre 0.4 $100.00 <br />Total - - - $9,262.00 <br />Notes: Johnson & Sons Excavating provided equipment costs; Granite Seed provided seed costs. <br />Tetra Tech February 2008 15
The URL can be used to link to this page
Your browser does not support the video tag.