<br />MOUNTAIN COAL COMPANY, L.L.C. -WEST ELK MINE
<br />LOWER REFUSE PILE -MONITORING SURVEYS
<br /> SURVEY 73 SURVEY 74 SURVEY 75 SURVEY 76
<br />Point Point Point Point
<br />'81 `B1 `B1 *B1
<br />82 404,251.10 82 404,251.10 62 404,251.10 B2 404,368.10
<br /> 1,448, 644.10 1,448, 644.10 1,448,644.10 1,448,064.60
<br /> 6,152.20 6,152.20 6,152.20 6,143.80
<br />83 404,288.40 83 404,288.40 83 404,288.40 B3 404,322.60
<br /> 1,448,550.80 1,448,550.80 1,448,550.80 1,448,057.70
<br /> 6,151.70 6,151.70 6,151.70 ~ 6,163.90
<br />64 404,321.10 84 404,321.10 84 404,321.10 84 404,288.30
<br /> 1,448,456.70 1,448,456.70 1,448,456.70 ~ 1,448,550.80
<br /> 6,149.30 6,149.30 6,149.30 6,151.00
<br />B5 404,350.60 B5 404,350.60 B5
<br />404,350.60
<br />B5
<br />404,321.10
<br /> 1,448, 361.30 1,448, 361.30 1,448, 361.30 1,448,456.70
<br /> 6,149.30 6,149.30 6,149.30 6,149.30
<br />B6 404,377.10 B6 404,377.10 B6 404,377.10 B6
<br />404,350.60
<br /> 1, 448,265.10 1,448,265.10 1,448,265.10 1,448,361.20
<br /> 6,148.60 6,148.60• 6,148.60 6,149.20
<br />B7 404,401.10 87 404,401.10 B7
<br />404,401.10
<br />B7
<br />404,377.10
<br /> 1,448,168.30 1,448,168.30 1,448,168.30 1,448,265:10
<br /> 6,146.90 6,146.90 6,146.90 ~ 6,148.60
<br />B8 404,417.10 88 404,417.10 B8 404,417.10 B8 404,401.10
<br /> 1,448,069.40 1, 448,069.40 1,448,069.40 1,446,168.30
<br /> 6,142.40 6,142.40 6,142.40 6,146.90
<br />69 404,433.30 89 404,433.30 B9 404,433.30 B9 404,417.10
<br /> 1,447, 971.30 1,447,971.30 1,447,971.30 1,448,069.40
<br /> 6,136.20 6,136.20 6,136.20 6,142.40
<br />810 404,449.20 B10 404,449.20 810 404,449.20 810
<br />404,433.30
<br /> 1,447,874.30 1,447, 874.30 1, 447, 874.30 1,447, 971.30
<br /> 6,128.60 6,128.60 6,128.60 6,136.20
<br />811 611 811 811 404,449.20
<br />1,447,874.30
<br />6,128.50
<br />" This point was destroyed by the new road construction during September, 1991, and vdil! not be reset,
<br />1/2/20071:33 PM
<br />Irp06.sheet
<br />
|