Laserfiche WebLink
~~1~~ ~ ~~i1.G~ ~ . <br />CONSULTING GEOTECHNICAL ENGINEEF2S~AND.MATERIALTESTfNG <br />DAILY FIELD REPORT -FIELD pENSITY'TESTS <br />Date: Wednesday, Nov/8/06 Arrive Time: 10:00 AM <br />Depart Time: <br />Project Name: Miscellaneous Testing Weather:' Clear <br />Project.Number: M06072MT Temp: ' <br />Client: West Elk Mine Client Representative: Henry Barbe <br />General Contractor: West Elk Mine Supervisor: Henry Barbe <br />Specialty Contractor: Specialty Superintendent or Foreman: <br />Source of Fill Material: From the mine Plans and Specs; N/A <br />Prepared by: gated: <br />Contractor's Equipment Used: Haul truck, dozer and sheepsfoot compactor <br />Lambert and Associates Equipment Used -Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On-Site to: <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow-up from Prior Visit: Retests Performed: None <br />Concerns for Next Visit; None Retests Needed: <br />Other personnel contacted on-site: name/firm <br />Notes: <br />I performed nuclear field density tests, as requested by Mr. Barbe with West Elk Coa! Mine, of coal gob being placed <br />on the RPE. Please refer to the test results sheets for approximate test locations and test results. The test results <br />indicate only the relative compaction and moisture content of the material tested at the elevation and location tested at <br />the time of our site visit. Moisture content samples were obtained. <br />Lambert and Associates Technician: Hayes <br /> <br />