Laserfiche WebLink
involve the affected lands, such as placement of waste rock on the surface. (There will be no <br />placement of waste rock on the surface and all bulk samples will be placed in existing covered <br />bins on the surface.) <br />5. "Please be aware that COAG is responsible for reclamation of disturbance created under <br />this NOI until a future mining permit is obtained. In addition, the area under this must be <br />included in the affected area boundary and bonded for in any future permit." <br />Response: COAG Corporation understands it reclamation obligation. <br />6. "Please explain in further detail the SWMP under this NOL" <br />Response: COAG Corporation will not be creating any new disturbance under this NOI. <br />COAG Corporation will use existing benches and roads. Standard SWMP practices such as <br />straw bales, filter fabric, graveled parking areas and other such materials will be used to control <br />bench storm water runoff. No diversion ditches or other similar structures are anticipated at this <br />time. <br />Respectfully, <br />G ,~z~l~ <br />H. Bruce Humphries <br />Consultant <br />RPM, Inc. <br />cc: COAG Corporation. <br />Mr. Mickey Fouts, CHR and CEO <br />200 S. Wilcox St., #402 <br />Castle Rock, CO 80104 <br />