My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-01_REPORT - C1996083 (8)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2008-05-01_REPORT - C1996083 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:59 PM
Creation date
5/1/2008 3:39:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REPORT
Doc Date
5/1/2008
Doc Name
2007 Bi-Annual Subsidence Report
From
J.E. Stover & Associates
To
DRMS
Permit Index Doc Type
Subsidence Report
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />~i <br />• <br />Station General Location Result <br />7A - 7C Hubbard Creek No significant change <br />17A -17F Hubbard Creek No significant change <br /> D4 Headgate and Mining complete. Maximum subsidence 2.4' over D4 <br />1A-1J North Mains head ate 1 A <br /> <br />23A - 23C Mouth of Dove Gulch No significant change <br />24A - 24G West Submains Mining complete. Maximum subsidence 7.8' (24G) <br /> WD1 & B1 <br /> Mining complete. D-Seam max subsidence 5.7' (25C) <br />25A - 25F WD2 Panel & 62 Panel B-Seam max subsidence 14.3 25C <br />26A - 26G WD1 Panel 8~ B1 Panel Mining complete. Maximum subsidence 4.7' (26E) <br /> B-Seam max subsidence 12.2' (26E) <br />27A - 27D WD2 Panel & 62 Panel Mining complete. Maximum subsidence 4.0' (27B) <br /> B-Seam max subsidence 10.8' (27B) <br />28A - 28D WD1 Panel 8~ 61 Mining complete. Maximum subsidence 6.2' (28B) <br /> B-Seam max subsidence 12.9' (28B) <br />29A - 29D WD2 Panel Outcrop 29A has subsided 1.7' <br />30A - 30D WD Panels Outcrop No significant change <br />31 A - 31 C D1 Tailgate No significant change <br /> 32G Subsided 7.3'. Subsidence monument installed after <br />32A-32M B-2 Panel D-Seam was mined. <br /> 33A Subsided 6.2'. Subsidence monument installed after <br />33A-331 B-3 Panel D-Seam was mined. <br /> 34-A Subsided 5.3 Subsidence monument installed after <br />34A-34K B-3 Panel D-Seam was mined. 34-B Subsided 6.0'. <br /> 35-C Subsided 7.3'. Subsidence monument installed after <br />35A-35D B-3 Panel D-Seam was mined. <br /> B-4 Panel No subsidence monuments over D-4. <br /> 8D located on the northern edge of B-5 Panel subsided <br />8D B-5 Panel 7.0'. <br /> 9A located in the center of B-6 panel subsided a total of <br /> 1.4 feet. 6' is attributable to the D Seam. The initial <br />9A B-6 Panel mining in B-6 likely triggered the -7/1/07 Freeman Gulch <br /> landslide. <br />The table shows the B-1 and B-2 panels over the WD panels have added an additional <br />8.4', 7.1', 6.8' and 6.6' feet of subsidence at monuments 25C, 26E, 27B and 28B <br />respectively. <br />-3- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.