Laserfiche WebLink
• <br />Bowie Resources, LLC <br />Bowie No.1 Mine <br />2007 Annual Hydrology Report <br />Initiated 9/1/1981 9/1/1981 <br />Activated 9/1/1981 9/1/1981 <br />Date 11/16/2007 6/21/2007 <br /> <br />• <br />Field <br />1 In11TC <br />B05 <br />Borehole 5 <br />Depth - 32.5' <br />Elevation - 6883.2' <br />Summary Information <br />Baseline Operation <br />nn:.. n..e nn~.. nn~n Agin Mov <br />Static Water Level Feet 32.17 32.51 32.94 32.31 32.28 <br />Water Elevation Feet 6850.3 6850.7 6851.0 6850.89 6850.92 <br />Tern erature Celsius <br />Conductivity umhos/cm <br />pH su <br />Field Comments Dry Dry <br />Boreho/es 8-4 and B-5 are located below the crushing and screening fill and were installed to detect <br />possible seepage in the original grade material. <br />There is no baseline collection possible for points initiated after the influence of mining. <br />Ground Water <br />Figure No. 3 <br />The area of concern for monitoring point 805 was affected by the mining operation before its establishment. Therefore, <br />all recorded monitoring events are considered Operational. <br />