Chapter II <br />For this permit submittal, and in future communications, the operator will refer to the <br />four phases, as follows: <br />Phase 1 was approved as a Permint Revision in September, 1984. <br />Phase 11 was approved as a Technical Revision in July, 1986. <br />Phase 111 was approved as Phase I of a Technical Revision in <br />September, 1987. <br />Phase N (Phase 11 of the 1987 TR) has not been permitted. <br />The Sutey facility expansion is as follows: <br />- Phase I: The planned capacity of the pile in Phase I <br />was approximately 875,000 cu. yds. of refuse. The <br />total disturbed area of this phase is 15.8 acres. The <br />pile has nearly reached the Phase I capacity at the <br />time of permit submittal. <br />Two sediment ponds were designed and <br />constructed to handle Phases I and II. <br />- Phase 11: Expands the pile to handle a total of <br />1,700,000 cu. yds. The additional disturbed area is <br />e~ 14 acres. <br />- Phase III: Expands the Sutey refuse disposal area <br />an additional 11.1 acres, increasing pile capacity to <br />approximately 7,800,000 cu. yds. <br />It is anticipated this will provide sufficient capacity <br />for 7 to 10 years of waste. <br />The refuse conveyor will be extended an additional <br />1,150' north of the existing, Phase I pile, with an <br />additional 5.3 acres of disturbed area. <br />A third sediment pond will be constructed for Phase <br />III. <br />- Phase N: The next phase, which has not yet been <br />permitted, will provide substantial additional <br />capacity, sufficient for many years to come. <br />An additional sediment pond will be constructed for <br />Phase IV. <br />39 <br />