Laserfiche WebLink
-3- <br />• <br />• <br />s <br />7. Mineral ownership: <br />(indicate currently <br />permitted acre for each) <br />Federal 5 8 41 ac. , <br />State ac., <br />.Pri vateg 4 7 8 ac. , <br />Indian - ac. <br />8. Surface wnership: <br />(indicate currently <br />permitted acreage for <br />each) <br />Federal Z.5S1.3 ac., <br />State ac., <br />Private 3 8 8 3 ac . , <br />Indian ac. <br />9. Affected. area (in acres) <br />10. Disturbed area (in acres) <br />11. Acreage of area reclaimed <br />in previous permit term <br />a) backfilled and graded <br />b) retopsoiled <br />c) reseeded <br />12. Acreage for which bond <br />has been released <br />a) 60 percent <br />b ) 85 percent <br />c) 100 percent <br />13. Renewal Term Requested <br />(Years) <br />Permitted <br />5841 <br />3478 <br />7503 <br />3883 <br />11386 <br />333 <br />Portions of <br />n/a <br />n/a <br />n/a <br />None <br />n/a <br />n/a <br />n/a <br />n/a <br />Actual .Proposed <br />the old oal refuse pi <br />n/a <br />n/a <br />n/a <br />n/a <br />n/a <br />n/a <br />n/a 5 Years <br />(Note: If the application contains proposed (new) acreage, then a permit 1 <br />I revision application form must also be completed for those acreages. I <br />14. Type of Mine (check one): x Underground, Surface, <br />Combined Surface and underground, x Load-Out, Other. <br />15. Current Permit Status (check one): x Active, Temporary Cessation, <br />Permanent Cessation (reclamation only), Suspended <br />16. Current Estimated Life of Mine in years: 40 <br />3 <br />