Laserfiche WebLink
APPENDIX II-B-5 <br />SUTEY COAL REFUSE DISPOSAL FACILITY <br />Table of Contents <br />Section Subject Page <br />A Summary of Contents of Appendix 1 <br />B Permit Approvals 2 <br /> 1. Mine Safety and Health Administration Approval 2 <br /> 2. Approval of Short Section Conveyor System 3 <br /> 3. Approval of Ponds, Conveyor and Roads 8 <br />• 4. Permit Revision Findings Document 12 <br />C Access Road Design 19 <br />D Pian to.Seal Gas Well 25 <br />E Seed Mix for Disposal Area 26 <br />F MR for Placement of Sediment Pond Cleanings on Refuse Pile 29 <br />G TR for Topsoil Pile Perimeter Ditch 31 <br />H Plan to Stabilize Topsoil Pile 34 <br />1 MR for Phase II (1986) Expansion Plan 35 <br />J Waste Pile Stability Analysis 62 <br />K TR for Phase II (1987) Expansion Plan 85 <br />L MR for Conveyor Extension 142 <br />M TR-9, Incidental Permit Boundary Change 145 <br />N TR-10, for Light Use Road 152 <br />O MR-9, Strip Topsoil for Sutey Extension 160 <br />P MR-10, Ditch Design - Sutey Conveyor 161 <br />• <br />,_ <br />_... <br />- - <br />