Laserfiche WebLink
• <br />-2- <br />Stipulation No. 11 <br />PRIOR TO CONSTRUCTION OF THE ACCESS ROAD IN DISNEY CANYON, THE PERMITTEE <br />MUST EITHER COMMIT TO CONSTRUCTION OF THE ROAD CUTS AT A GRADIENT NO <br />STEEPER THAN lh:ly IN ROCK AND 1.5h:1v IN UNCONSOLIDATED MATERIAL AND <br />COMMIT TO CONSTRUCTION OF ROAD EMBANKMENTS AT A GRADIENT NO STEEPER THAN <br />1.5h:1v OR SUBMIT APPROPRIATE GEOTECHNICAL ANALYSES WHICH SHOW THAT THE <br />PROPOSED ROAD CUTS HAVE A MINIMUM SAFETY FACTOR OF 1.5 AND THE ROAD <br />EMBANKMENTS HAVE A MINIMUM SAFETY FACTOR OF 1.25. IF THE PERMITTEE <br />COMMITS TO THE CONSTRUCTION GRADIENTS STIPULATED ABOVE, THE <br />CROSS-SECTIONS MUST BE CHANGED ON THE MAP. <br />• <br />C <br />/ep <br />Doc. No. 3926 <br /> <br />T1 - <br />