My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-22_PERMIT FILE - C1981017 (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
2008-04-22_PERMIT FILE - C1981017 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:23 PM
Creation date
4/30/2008 9:42:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
4/22/2008
Section_Exhibit Name
Chapter II-B Appendix II-B-3 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MID-CONTINENT RESOURCES, INC. <br />PRODUCERS OF THE FAMOUS COAL BASIN COKING COAL <br />BOX 158 <br />CARBONDALE, COLORADO 81623 <br />.ONTNiENT NESOUNCES. INC. TELFPFIONE <br />. ~/WNfIEIO ROAO~SUITE 220 (~) /at-2Sa~ <br />wasos>trsnoolc IulNas eoa2+ Tvnc <br />no as assn <br />February 14, 1984 .so <br />Mr.~Jim Herron <br />Mined Land Reclamation Division <br />423 Centennial Bldg. <br />1313 Sherman St. <br />Denver, Colorado 80203 - <br />Re: Technical Revision for Conveyor System <br />File No. C-017-81 <br />Dear Jim: <br />Please resurrect this file and let me know what information <br />you need to complete it. <br />The last letter I have is from September 29, 1983, which <br />lists three items: <br />1. Topsoil stockpile locations <br />2. Reclamation costs <br />3. Design assumptions and calculations for hydrologic <br />systems <br />Geo-Hydro Consultants of Denver will submit a revised map <br />showing the topsoil stockpile locations and they will also submit <br />_ the design assumptions and calculations for the hydrologic control <br />systems. <br />The following reclamation costs are proposed, based on 22.5 <br />acres disturbed: <br />Equipment removal <br />Return to A.O.C. <br />Topsoil replacement <br />Fertilizer (if required) <br />Seed <br />Mulch <br />Seedlings (trees and shrubs) <br />14 days at $1000 $14,000 <br />400 9,000 <br />200 4,500 <br />100 2,250 <br />200 4,500 <br />100 2,250 <br />200 4,500 <br />Total $41,000 <br />60 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.