My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-22_PERMIT FILE - C1981017 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
2008-04-22_PERMIT FILE - C1981017 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:23 PM
Creation date
4/30/2008 9:39:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
4/22/2008
Doc Name
Adit/Rock Tunnel Project
Section_Exhibit Name
Chapter II-B Appendix II-B-3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. COAL BASIN MINE PERMIT APPLICATION <br />MID-CONTINENT RESOURCES, INC. <br />CARBONDALE, COLORADO <br />ROCK TUNNEL PROJECT <br />A. Summary of Contents of this Appendix <br />Contained in this Appendix is backup material that <br />supplements the general discussion of the rock tunnel project <br />in Volume 1, Section II-B-3-c. <br />As is evident from the table of contents on the preceding <br />page much of the material contained herein are the various <br />approvals for the project as it has proceeded over the past <br />several years. Technical data prepared by consulting companies <br />in such areas as soils samples and compaction tests are available <br />• on call for anyone desiring such information. Most of the design <br />information concerning refuse pile configuration and drainage <br />control is contained in the five Geo-Hydro Consulting, Inc. map- <br />charts labeled II-B-App.3, 1 thru 5 and located. in map jackets <br />at the rear of this volume. <br />This Appendix, together with Section II-B-3-c and maps <br />(Exhibits II-B-3, II-B-4a and II-B-4b) in Volume 1, Appendix <br />III-G-4 (Soils survey), and Attachment 5 to Appendix II-B-7 in <br />Volume 3 (Hydrologic Control Plan), should provide the reviewer <br />with all pertinent information on the rock tunnel project. <br /> <br />-- - <br />~,. _ ~ -- <br />_~~:: .. ....~. _ ~~ .. , n ,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.