Laserfiche WebLink
• <br />Appendix II-B-3 <br />Adit/Rock Tunnel Project <br />Table of Contents <br />• <br />Section Subject Page <br />A Summary of Contents of this Appendix 1 <br />B. Initial Approvals <br /> 1. Mined Land Reclamation Division 2 <br /> 2. Mine Safety & Health Administration 3 <br /> 3. White River National Forest Special Use Permit 4 <br />C. Geo-Hydro Consulting,lnc. -1984 Review 12 <br />p. MR for Variance from 100' Stream Buffer Zone Requirement 23 <br />E. TR for Rock Tunnel Trash Pile 27 <br />F MR for Rock Tunnel Sealing Plan 34 <br />G. TR for Temporary Disposal of Coal Refuse on Tunnel Pile 47 <br />H. MR for Temporary Disposal of Raw Coal on Tunnel Pile 51 <br />I. TR for Trommel Screen Waste on Tunnel Pile 55 <br />~, TR for Conveyor System 60 <br />K. Supporting Calculations, Rock Tunnel Waste Disposal Area 71 <br />L. TR-6. Rock Tunnel Pad Expansion (.9 Acre) 142 <br />M. MR-3. Relocation of Powerline 149 <br />N. TR-7. for Rock Tunnel Pad Expansion (1.7 Acres) 154 <br />O. MR-5. Pond "A" Discharge Structure 166 <br />p. MR-8. Pond Cleanings on Tunnel Pile 168 <br />Q. MR-9. Solid Non-Coal Waste Disposal 170 <br />• <br />