My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-22_PERMIT FILE - C1981017 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
2008-04-22_PERMIT FILE - C1981017 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:23 PM
Creation date
4/30/2008 9:39:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
4/22/2008
Doc Name
Adit/Rock Tunnel Project
Section_Exhibit Name
Chapter II-B Appendix II-B-3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i,_ <br />CONSTRUCTION PROCEDURES AND MODIFICATIONS <br />COAL REFUSE DISPOSAL FACILITY AND <br />ROCK TUNNEL WASTE DISPOSAL FACILITY <br />COAL BASIN MINES, REDSTONE, COLORADO <br />FOR MID-CONTINENT RESOURCES, INC. <br />1.0 INTRODUCTION <br />• <br />Mid-Continent Resources, Inc. (Mid-Continent) operates two <br />disposal facilities at their property. The coal refuse disposal <br />facility is located in the immediate vicinity of the wash plant. <br />The operation of this facility is scheduled only for, a limited <br />period of time as there is no substantial storage volume avail- <br />able at the site. The second disposal facility serves for the <br />deposition of the rock obtained during the excavation of the rock <br />tunnel. <br />The Mined Land Reclamation Divison (MLRD) directed Mid- <br />Continent to determine whether the construction methods at both <br />these disposal facilities comply with the previously established <br />design criteria and to evaluate the necessary changes in the con- <br />struction methods, if they do not comply with these criteria. <br />Mid-Continent instructed Geo-Hydro Consulting, Inc. (Geo-Hydro) <br />to perform the necessary work to comply with this requirement. <br />2.0 SCOPE OF WORK <br /> <br />~_ <br />I <br />r' <br />.__ <br />The scope of this study is to review all available material <br />related to the construction of both disposal facilities, to <br />review the stability analyses performed for both of them, con- <br />struction procedures recommended in pertinent reports,_and to re- <br />view pertaining regulations of the State of Colorado. <br />A field inspection of both facilities and a limited program <br />of field and laboratory testing were proposed to obtain addition- <br />al data on the conditions of both facilities. Finally, based on <br />this work, recommendations should be made on any construction <br />modifications, if necessary. These recommendations should deal <br />mostly with the problems of stability, final slopes, compaction <br />and future monitoring at both waste piles. <br />14 ~ - <br />.~.~'~ - ~- >, _ a:_.._ ._ ~. ~. . GEaMYD~O CONSUlT1NG, INC_. <br />
The URL can be used to link to this page
Your browser does not support the video tag.