My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-22_PERMIT FILE - C1981017 (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
2008-04-22_PERMIT FILE - C1981017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:22 PM
Creation date
4/30/2008 9:38:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
4/22/2008
Doc Name
Coal Basin Operations 1956-1987
Section_Exhibit Name
Chapter II-B Appendix II-B-2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
App. II-B-2 <br />Since 1961 the coal has been "washed" in the preparation plant, which is situated at <br />the central complex yard. Rock and other impurities, separated from the salable <br />coal, have been deposited in refuse piles. <br />There are two refuse piles. The "Old Pile" is situated on the east side of the central <br />complex yard, adjacent to the parking lot. Refuse from the washing process was <br />deposited on the old pile until 1985. <br />The "Sutey Pile" has received preparation plant refuse since 1985, and will be the <br />site for disposal of refuse until the completion of mining. <br />6. Adit/Rock Tunnel. <br />Face-up work for the Adit/Rock Tunnel portal began in 1979. It was a cut and fill <br />program, with the fill used for a yard area outside the portal. <br />As materials were excavated from the tunnel, a permanent fill area was constructed <br />south of the portal. In addition, the portal yard was extended, using materials from <br />the tunnel excavation, in 1987. <br />Surface facilities have been constructed on the fill. <br />• Extension of the Adit/Rock Tunnel to the B-bed and the M-bed, in the areas of No. 1 <br />and No. 2 Mines, have allowed use of the twin bores of the Adit/Rock Tunnel as the <br />major transportation artery in the mine operation since the fall of 1987. <br />In addition, conveyor belts have replaced truck haulage as the chief means of <br />surface coal transport, and of refuse disposal. <br />As mentioned previously, however, the Adit/Rock Tunnel must be completed, <br />including lateral extensions to the workings of Nos. 3, 4 and 5, in order to entirely <br />replace the use of the mountain trucks, haul roads and portals for coal haulage. <br />7. Anticipated Development. <br />The modernization program will be continued. Major facets include: <br />Raw coal storage will be in underground bunkers. Face-up work has been done for <br />these bunkers. Presently, storage is in open piles. <br />The Adit/Rock Tunnel will be continued through to the west side of Huntsman Ridge, <br />allowing an additional escapeway and ventilation intake. <br />Lateral extensions to the workings of Nos. 3, 4 and 5 will allow transportation to and <br />from these areas by the Adit/Rock Tunnel, thus replacing the haul roads and portals <br />as the major transportation arteries for haulage of coal, machinery and materials. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.