My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-22_PERMIT FILE - C1981017 (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
2008-04-22_PERMIT FILE - C1981017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:22 PM
Creation date
4/30/2008 9:38:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
4/22/2008
Doc Name
Coal Basin Operations 1956-1987
Section_Exhibit Name
Chapter II-B Appendix II-B-2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX II-B-2 <br />COAL BASIN OPERATIONS <br />1956-1987 <br />1. The Mines. <br />The Coal Basin operations of Mid-Continent began with construction of facilities in <br />1953. Production began in 1956. <br />The Dutch Creek No. 1 Mine, opened in 1956. <br />The L. S. Wood No. 2 Mine, opened in 1973. <br />The L. S. Wood No. 3 Mine, opened in 1966. <br />The Bear Creek No. 4 Mine, opened in 1969. <br /> <br />The Coal Basin No. 5 Mine, opened in 1973. <br />Two seams of coal are mined at Coal Basin. The B-bed, mined from the Entries of <br />No. 1, 3, 4 and 5; and the Middle-bed, mined from No. 2. The Middle-bed lies 450 <br />feet above the B-bed. <br />2. Construction -Portals and Haul Roads. <br /> <br />All the mines were developed as drift mines, which follow the coal from outcrop, <br />downdip. Mine portals were built directly at the coal seam outcrop. Following a <br />common practice for western U.S. mines, the entry was excavated by a cut above <br />the coal seam. Material from the excavation was used as a fill, creating a mine <br />bench on which surface facilities were then constructed. <br />A system of haul roads were developed, connecting the portals, at 10,000' <br />elevation, with the central complex yard area, at 8,000' elevation. Development of <br />the haul road system was a difficult task due to rugged, mountainous topography, <br />steep slopes, severe erosion problems, potentially unstable slopes and high <br />avalanche danger. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.