Laserfiche WebLink
_ (2) Room and Pillar Mining 9 <br />(3) Multi-Lift Mining 10 <br />b. Support Activities -Underground 10 <br />(1) Ventilation 10 <br />(2) Dust Suppression 10 <br />(3) Roof Control 10 <br />c. Major Equipment -Underground 10 <br />d. Major Equipment -Surface 11 <br />e. Anticipated Annual and Dotal Production 11 <br />2. Operation Description 12 <br />a. Surface Operations Relai:ed to <br />Underground Mining 12 <br />b. Underground Mining 13 <br />c. Anticipated Mining SequE;nce - <br />Permit Term (1988-1993) 14 <br />d. Stratum to be Affected 15 <br />3. Mine Facilities 15 <br />a. Buildings and Structures 15 <br />(1) Central Cc-mplex/Prep. Plant Area 15 <br />(2) Portals 16 <br /> <br />- ~ _ __. _.__(3) List of Buildings and Structures .___ <br />16 - \' <br />b. Road System Haul Roads 16 <br />(1) Background/Development <br />• of Haul Roads 16 <br />(2) Present U:~age 18 <br />(3) Maintenance 18 <br />c. Access Road - Sutey 20 f <br />d. Light Use Roads 21 <br />... e. Public__Road_-_ Hwy._to Mine Facility_ 21 __~ <br />f. Conveyor System _.__ ____..__ _.._ 21 <br />(1) Overland Conveyor - <br />Mine to Raw Coal Storage 22 <br />(2) Preparation Plant to Sutey Pile 22. <br />g. Utility Corridors 22 <br />(1) Powerlines~ 22 <br />(2) Methane Caas Pipeline 23 <br />h. Sewage Treatment 23 <br />i. Water 23 <br />j. Communication 24 <br />k. Explosives Storage 24 <br />4. Ponds, Impoundments and Diversions 24 <br />a. General -Hydrologic Control Plan 24 <br />(1) Portal Are~~ Drainage and <br />Sediment (control Plan 25 <br />(2) Roads 25 <br />• <br />,.~x ~ max,, <br />~X~:=:::. :.:~. .::::.. .... Y <br />