Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk Pond 6 <br />NPDES ID. No.: None <br />Inspection Period: Third Quarter 2007 <br />Inspection Date: 09121!07 <br />General Description or Reference to Site Plan: <br />Pond 6 is anon-discharging facility designed to contain plant processing water. The plant has <br />been idle since 1996 and the pond is now used to dewater other ponds prior to clean-out. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Excellent odes Few Poor <br />Extensive Some Few None <br />Yes No ~~ <br />4). Erosion of the downstream toe of the embankment? Yes No ~ <br />~: Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />Yes No Li <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: ' I ~L <br />OTHER OBSERVATIONS: G~~ ~ ~ ~"~ 3 f <br />Date <br />No 1~"- <br />MSHA Qualified Impound ent Inspector <br />