Laserfiche WebLink
�� •• eE ' <br /> J I S <br /> ,ram FILE OUTLINE // / <br /> L FT. <br /> F'r 7 FT. 2\ �GAI4EYG'�' �Tl•GUCTI�.► �. j+, .r.i •.,. .�,. ....�.... � 2 <br /> 1 Fl" <br /> ' 1Q.f+JNAGE AiZFA � <br /> / <br /> ClJNVEIKO Gvnurvp Suercce <br /> �\ EX 1 S•rl N 4�c) 1 <br /> T` KCAL SECTION B - B OF CCNVEYOPz DIVERSION DITCH <br /> /ICI 1/IFFC ION C 17-7- <br /> 1�hanE.E I WASTE a 1 N 0 T E S <br /> �• L <br /> � 1 ) CONSTRUCT CONVEYOR DIVERSION DITCH PRIOR TO PHASE II <br /> • •�. �� h_ 4� L- OF CONVEYOR CONSTRUCTION . DITCH IS DESIGNED TO CARRY <br /> s, \ — — 10 YR/24 HR PEAK FLOW FROM DRAINAGE AREA SHOWN ON <br /> _ FIGURE A , WITH A MINIMUM FREEBOARD OF 0 . 3 FT. <br /> _ t <br /> 2 ) CHANNEL SHALL BE MAINTAINED AS NEEDED TO PREVENT UN- <br /> 9 / — DUE EROSION . FLOW VELOCITIES IN CHANNEL WILL BE <br /> E .9s MINIMAL <br /> 19 " . <br /> O,'50 ���' • I ` <br /> �T(2ANSr� A,71 NT' � I <br /> \ 6r)5 I <br /> 8300 � <br /> T1CN <br /> / ! <br /> \� z36.0 <br /> r <br /> CONSTRUCTION SEQUENCE <br /> LEGEND <br /> THE WASTE PILE AND RELATED STRUCTURES WILL BE CONSTRUCTED IN PHASES AS <br /> DETAILED BELOW. <br /> O OUTL NE OF 5FiDi"IEN7ATION THE AREAS WHICH WILL BE AFFECTED DURING EACH PHASE ARE SHOWN ON FIGURE A. <br /> R�uG <br /> THE SCHEDULE INDICATED IS TENTATIVE AND WILL DEPEND ON THE WEATHER. <br /> DUTLINF_ OF "4A,5e 1 p� =F � SbN DITCH\ PHASE I CONVEYOR REMOVE VEGETATION AND TOPSOIL IN/JUTE PIt_E 6 CONSTRUCTION (MAY 1984) APPROXIMATELY 1 ,200 FT LONG BY 30 <br /> FT WIDE CORRIDOR FROM WASH PLANT <br /> \ 17 c� UNE C� Q y/p6 ALE TO TRANSFER POINT. BEGIN CONSTRUC- <br /> QJTLI NE Cr- R w`-EIZ t�.1 llxATlOn1 OF Cj2Ogg -_aZ�CT10N <br /> TION. <br /> CCKPGTQ-CiTCQ C VA NA,(„E ,ems PHASE 11 CONSTRUCTION 1984) REMOVE <br /> APPROXIVEGETATION <br /> AND <br /> TOPSOIL <br /> IN <br /> 30 <br /> LY <br /> NG BY <br /> FT WIDE CORRIDOR FROM TRANSFER <br /> FI�UI�E A , I��SG ( ADD t SE I ' GONVEY012 C.ON�71;'z�UC-1�{'ON Dvelz-,SC� POINT TO ON END OF <br /> BE FROM LT. ITRANS- <br /> FER POINT TO END OF BELT.PHASE I PILE CONSTRUC- REMOVE VEGETATION AND TOPSOIL, R IE ca­_ <br /> TION (OCTOBER 1984) AND BEGIN REFUSE DISPOSAL. D P C 11987 <br /> PHASE II PILE CON- EXTEND PHASE I PILE NORTHWARD TO MINED LNrvu <br /> STRUCTION (MAY 1986) INCREASE PILE CAPACITY AND SUR- RECLAMATION DIVISION <br /> FACE AREA. <br /> GENERAL NOTES : <br /> 1 ) PHASE I OF CONVEYOR CONSTRUCTION (WASH PLANT TO TRANSFER POINT) IS <br /> INSIDE THE PRESENT PERMIT BOUNDARY AND IS MOSTLY DISTURBED LAND . A <br /> DRIP PAN WILL BE PROVIDED BELOW THE CONVEYOR TO CATCH MATERIAL DROP- <br /> PING FROM THE CONVEYOR ; SUCH MATERIAL WILL BE CHANNELED T•O THE EXIST- <br /> ING SEDIMENTATION PONDS SOUTH OF COAL CREEK. <br /> - 2) PRIOR TO PHASE 'II OF CONVEYOR CONSTRUCTION (TRANSFER POINT TO END OF <br /> BELT) , CONSTRUCT LOWER SEDIMENTATION POND AS SHOWN ON SHEET 5, CON- <br /> STRUCT CONVEYOR RUNOFF DIVERSION DITCH AS SHOWN ON FIGURES A AND <br /> SECTION B-B' . ROUTE MATERIAL FROM CONVEYOR DRIP PAN ABOVE TRANSFER <br /> POINT INTO CONVEYOR RUNOFF DIVERSION DITCH. <br /> 3) PRIOR TO PHASE I PILE CONSTRUCTION, CONSTRUCT UPPER SEDIMENTATION POND <br /> AS SHOWN ON SHEET 5, AND EAST AND WEST RUNOFF COLLECTION DITCHES AS <br /> NEEDED AND STREAM DIVERSION AS SHOWN ON SHEET 4. PHASE I PILE CON- <br /> STRUCTION SHALL CONSIST OF REMOVAL OF VEGETATION AND TOPSOIL, AND C <br /> PILE CONSTRUCTION. �2UNOFF DIVEf2SION 1=0Z PHASE � AND <br /> 4) PRIOR TO PHASE II PILE CONSTRUCTION, CONSTRUCT EAST AND WEST P.UNOFF ` <br /> COLLECTION DITCHES AS INDICATED ON SHEET 4. REMOVE VEGETATION AND PHASE I I OF C.ONVEY02 CONST UCTIQN <br /> TOPSOIL FROM FOUNDATION AREA AND INITIATE PHASE II CONSTRUCTION. <br /> GOLDER ASSOCIATES <br /> 1 7301 WEST COLFAX AVE., SUITE 275 MIp CLN 1TINE .T eE5oLj ,Grr,u, IN( <br /> GOLDEN, COLORADO 80401 90 80X i56 <br /> (303) 278-8662 CA12B0NDALE, CoLjo e) <br /> DESIGNED BY : ^Y-s CHECKED BY : (mM <br /> DRAWN BY - DL_ APPROVED BY <br /> DRAWING NO. SHEET OF q <br /> DATE : SCALE A6 iNolcA-rFo <br />