My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (26)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 6:06:48 AM
Creation date
4/23/2008 2:25:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Permit File
Doc Date
12/1/1987
Doc Name
Runoff Diversion for Phase I and Phase II of Conveyor Construction
Section_Exhibit Name
Map II-B-APP 5-3 Sheet 3 of 9
Media Type
M
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.r <br /> a � <br /> !i FT. <br /> Alm OuTLINNE �i� /%� r <br /> FT 2 Ft 2 FT <br /> 4 <br /> V` <br /> G�un,D SueFAGE <br /> / l�R�JNAGE SEA <br /> rT � <br /> 1 2 <br /> TTe;E:F- <br /> TYPICAL SECTION - B� OF CONVEYOi2 DIVE�ION DITCH <br /> �\��jCIVEFc`= ION NOTES : <br /> 1 ) CONSTRUCT CONVEYOR DIVERSION DITCH PRIOR TO PHASE II <br /> Too 1 OF CONVEYOR CONSTRUCTION . DITCH IS DESIGNED TO CARRY <br /> r \ GiLE OUTL NE \ 10 YR/24 HR PEAK FLOW FROM DRAINAGE AREA SHOWN ON <br /> ��•�„_. . •••• ... .......... ...r.�,��,�. �.�, ice. .tea. — t•.• — — FIGURE A , WITH A MINIMUM FREEBOARD OF 0 . 3 FT . <br /> O ' <br /> L I <br /> im <br /> it <br /> 2 ) CHANNEL SHALL BE MAINTAINED AS NEEDED TO PREVENT UN- <br /> L LOvvE2 2 F r pl�,r M P , DUE EROSION . FLOW VELOCITIES IN CHANNEL WILL BE <br /> M I N I M A L . <br /> �19 <br /> s <br /> 6 <br /> CIO <br /> It -8300 <br /> 0 <br /> z 36.0 . • / <br /> CONSTRUCTION SEQUENCE <br /> LEGEND THE WASTE <br /> EILED BPILE AND RELATED STRUCTURES WILL BE CONSTRUCTED IN PHASES AS <br /> DETTHE AREAS WHICH WILL BE AFFECTED DURING EACH PHASE ARE SHOWN ON FIGURE A. <br /> O OUTLINE OF SI;DDIMENTATION <br /> I�ND THE SCHEDULE INDICATED IS TENTATIVE AND WILL DEPEND ON THE WEATHER.L <br /> PHASE I CONVEYOR REMOVE VEGETATION AND TOPSOIL IN <br /> \ OUTLINE OP t?L1o` l QLJNOFF nl` E12SI01\1 pITGI-+ CONSTRUCTION (MAY 1984) APPROXIMATELY 1 ,200 FT LONG BY 30 <br /> \ WP�E At_E FT WIDE CORRIDOR FROM WASH PLANT <br /> g TO TRANSFER POINT. BEGIN CONSTRUC- <br /> TION. <br /> L,:!:�IOrJ Cr- (was -_EGrION PHASE II CONVEYOR REMOVE VEGETATION AND TOPSOIL IN <br /> �\ QJ�LINE cF Fik��ti2 Q�I./ ]e CONSTRUCTION (JUNE 1984) FT APPROXIMATELY <br /> CORRIDOR700 FT LONG BER30 <br /> CCU IS T21JCTfGJ CZAI N q(,�E plZEWIDE <br /> POINT TO END OF BELT. BEGIN CON- <br /> �IGUI2E A ►�-I�SE I AND � WSE I I CrONVEY(D2 �NST�l1CTION (2U►�10FF I�V�ZS 1 FERSTRUPOINNT TO END OF VOFOBELT. TRANS- <br /> PHASE I PILE CONSTRUC- REMOVE VEGETATION AND TOPSOIL, <br /> TION (OCTOBER 1984) AND BEGIN REFUSE DISPOSAL. <br /> PHASE II PILE CON- EXTEND PHASE I PILE NORTHWARD TO <br /> STRUCTION (MAY 1986) INCREASE PILE CAPACITY AND SUR- <br /> FACE AREA, <br /> GENERAL NOTES : <br /> 1 ) PHASE I OF CONVEYOR CONSTRUCTION (WASH PLANT TO TRANSFER POINT) IS RECEI�OED <br /> INSIDE THE PRESENT PERMIT BOUNDARY AND IS MOSTLY DISTURBED LAND. A <br /> DRIP PAN WILL BE PROVIDED BELOW THE CONVEYOR TO CATCH MATERIAL DROP- DEC 11987 <br /> PING FROM THE CONVEYOR ; SUCH MATERIAL WILL BE CHANNELED T•O THE EXIST- <br /> ING SEDIMENTATION PONDS SOUTH OF COAL CREEK. MINED I <br /> 2) PRIOR TO PHASE II OF CONVEYOR CONSTRUCTION (TRANSFER POINT TO END OF <br /> RECLAMATIONN DIVISION <br /> BELT) , CONSTRUCT LOWER SEDIMENTATION POND AS SHOWN ON SHEET 5, CON- <br /> STRUCT CONVEYOR RUNOFF DIVERSION DITCH AS SHOWN ON FIGURES A" AND <br /> SECTION B-B' . ROUTE MATERIAL FROM CONVEYOR DRIP PAN ABOVE TRANSFER <br /> POINT INTO CONVEYOR RUNOFF DIVERSION DITCH. <br /> 3) PRIOR TO PHASE I PILE CONSTRUCTION, CONSTRUCT UPPER SEDIMENTATION POND <br /> AS SHOWN ON SHEET 5, AND EAST AND WEST RUNOFF COLLECTION DITCHES AS NEEDED AND STREAM DIVERSION AS SHOWN ON SHEET 4. PHASE I PIjE CON- RUNOFF DIVE(2SION r-'OZ PHASE I AND <br /> STRUCTION SHALL CONSIST OF REMOVAL OF VEGETATION AND TOPSOIL, AND /� c / ^ /- <br /> PILE CONSTRUCTION. ; PHASE I I Or GON�/EYOI2 c�NSTIZUCTION <br /> 4) PRIOR TO PHASE II PILE CONSTRUCTION , CONSTRUCT EAST AND WEST RUNOFF <br /> COLLECTION DITCHES AS INDICATED ON SHEET 4. REMOVE VEGETATION AND COLDER ASSOCIATES <br /> TOPSOIL FROM FOUNDATION AREA AND INITIATE PHASE II CONSTRUCTION. 17301 WEST COLFAX AVE., SUITE 275 MItO (pI�1TINENT 2ESou?LEg ING <br /> 90 PAX 156 <br /> GOLDEN, COLORADO 80401 C.Ae60N0Al_6, CAIAt2AD0 <br /> (303) 278-8662 <br /> /Z s CHECKED BY !aM <br /> DESIGNED BY . Nc <br /> DRAWN BY ' D L— APPROVED BY <br /> DRAWING N0. 3—l�ZL> SHEET 5 OF q <br /> DATE : AP21L- I�I� SCALE A5 INDIGATW <br />
The URL can be used to link to this page
Your browser does not support the video tag.