Laserfiche WebLink
Project: <br />= • ' GEOTECH Client / On Site Rep: <br />Bowie Resources / B. Bear <br />Bowie Mine #1 Gob Pile ~ Civri,.Structural & Geotechnical Engineers.... <br />222 South Park Ave <br />• Montrose <br />CO 81407 Contractor /Rep: <br />Con-sy Inc. / W. Keith <br />Project No: <br />2008070-CNfl- Date: <br />3/25/2008 . <br />, <br />pn.: (s7o> zas-sees • FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />B. Wilson <br />DAILY CO MPACTIO N REPORT <br /> <br />TEST LOCATION <br />GR TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NoT SOIL LAB SAMPLE <br /> <br />NUMBER <br /> <br />Embankment Gob ADE ELEV <br />NUC <br />SAND <br />DENSITY <br />(pct) <br />MOISTURE <br />coNT. (°i°) <br />DENSITY <br />(pcf) <br />CONTENT <br />(°i°) <br />COMPACTION <br />WTTH[N <br />SPEC <br />TrPE <br />NUMBER <br />G-1 PT#2004) N11277.53/E13021.79 6865.1 X 76.8 20.0 78.9 23.0 102.7 gob #1 r/c @11% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE /DENSITY SPECIFICATIONS OBSERVATION /TESTING FIELD OBSERVATIONS <br />pecified Date: Compaction Equipment Used: <br />Compaction 90% + Cohesive Soils X <br />Requirement: Cohesionless Soils Full Time: ~ Day: 5 M T <br />X W Th F S <br />Sheepsfoot: ~X <br /> Part Time: ~ Weather: Sun Clear Overcast Rain Snow <br />Specified X Smooth Drum Roller: <br />Moisture N A Cohesive Soils X <br />Requirement: / Cohesionless Soils Number of Site Visits/Day: ~ Temp: To 32 32-SO 50-70 <br />X 70-85 85 Up <br />Vibratory: <br /> Testing Only: ~X Wind: Still Mod High <br /> Requested By (Company Name): X Other (List Below): <br />Laboratory Testing ASTM-698 Cohesive Soils X <br />Procedure: <br />Cohesionless Soils Wade Keith / <br /> <br />Con-Sy Inc. Humidity: Dry <br /> <br />X Mod Humid <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount <br />of material placed. Informed (Rep of Company) of Test Results: <br />Wade Keith / <br />Buckhorn was not informed prior <br /> <br />Contractor Not Working Due To: <br />The Contractor Is: <br />COn-S Inc. <br />Y to our arrival on site that the <br />contracto <br />ld <br /> <br /> <br />Inclement Weather: <br /> <br />Equipment MaIfUnCtlOn: <br /> <br />Processing Frozen Material: processing Wet Material: <br /> <br />stripping and/or Grubbing: Moisture Conditioning Dry MaYI: <br />Field Copies Given To: <br /> <br />Contractor: <br />Client: r wou <br />not be working <br />on this date. <br /> <br />UnknOWn: <br />Stockpiling FII:Removing Unsuitable MaYI: CM/GM: <br />Other: PAGE 1 OF 1 <br />08-070 Gob Pile Stability.xls DCR3-25-08bw#G-1-ap/sj <br />