Laserfiche WebLink
i <br />1 <br />1 <br />1 <br />1 <br />1 <br />t <br />1 <br />i <br />t <br />1 <br />i <br />i <br />1 <br />1 <br />1 <br />i <br />1 <br />1 <br />EXECUTIVE SUMMARY 1 <br />1.0 INTRODUCTION i 3 <br /> 1.1 Terms and Conditions 3 <br /> 1.2 Purpose and Scope of Work 3 <br /> 1.3 Project Description ~ 3 <br />2.0 LAND DISTURBED IN 20071; 5 <br />3.0 RECLAMATION ACTIVITIES IN 2007 6 <br /> 3.1 Constructed Wetlands Area and Adjacent Slope 6 <br /> 3.2 Tie Camp Creek Disposal Cell 7 <br />4.0 MONITORING AND ANNUAL REPORTING 10 <br /> 4.1 Slope Movement VectorAnalysis 10 <br /> 4.2 Inclinometer Evaluation 12 <br /> 4.3 Pinnacle Mine WorkingsiiMonitoring 13 <br /> 4.3.1 Spring and Seep Monitoring 14 <br /> 4.3.2 Groundwater Levels 14 <br /> 4.3.3 Pinnacle Adit Flow 15 <br /> 4.3.4 Radium and Uranium Concentrations at PP-01 17 <br /> 4.4 Sediment Control Embankment 17 <br /> 4.5 Waste Rock Dumps 21 <br /> 4.6 Water Quality Monitoring 21 <br /> 4.7 Radioactive Materials License 22 <br />5.0 INSPECTIONS 23 <br />6.0 SURETY 24 <br />7.0 RECLAMATION ACTIVITIES PLANNED FOR 2008 25 <br />Table of Contents <br />