My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-11_PERMIT FILE - M2008022
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008022
>
2008-04-11_PERMIT FILE - M2008022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:27:24 PM
Creation date
4/21/2008 11:37:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008022
IBM Index Class Name
PERMIT FILE
Doc Date
4/11/2008
Doc Name
112c operation permit application
From
4B Land & Livestock, LLC
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 Inspection and Maintenance <br />This section provides a description of the procedures to inspect and maintain the vegetation, <br />erosion and sediment control measures and other BMPs identified in this construction SWMP. In <br />accordance with the permit requirements, the entire stormwater management system will be inspected <br />every 14 days during mining activities and after any significant precipitation or snowmelt event that causes <br />significant erosion. The BMPs will be maintained in good and effective operating condition during mining <br />activities. <br />During Mining and hauling activities at the site, silt fences (if used) ditches (where present) will <br />be inspected for excessive sediment buildup that may infringe on the freeboard. If such excessive sediment <br />buildup occurs, the sediment will be removed, as necessary. The stability of silt fences will be inspected <br />for proper anchorage at the base, for verticality of the fence supports and for fabric tears or rips. <br />Appropriate repairs will be made as necessary if significant problems are noted. Inspections, testing, and <br />preventive maintenance will be performed on all site equipment and operational systems. This program will <br />aim toward prevention of failures by adjustment, repair or replacement of site equipment and /or structures. <br />All excavating and hauling equipment will be regularly inspected and maintained. <br />The administrators for the SWMP at this site will be Mr_ Scott Brennise, owner of land parcel and 4B Land <br />& Livestock LLC, and a designated contract operator employee. They will be responsible for the <br />development, implementation, maintenance and revision of this SWMP.
The URL can be used to link to this page
Your browser does not support the video tag.