My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-18_PERMIT FILE - X200622307 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200622307
>
2008-04-18_PERMIT FILE - X200622307 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:06 PM
Creation date
4/21/2008 10:02:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200622307
IBM Index Class Name
PERMIT FILE
Doc Date
4/18/2008
Doc Name
Project Update Letter
From
Oxbow Mining, LLC
To
DRMS
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^~^ <br />I~` <br />XBOW MINING, LLC <br />3737 Hwy 133 P.O. Box 535 Somerset, Colorado 81434 USA Tel (970)929-5122 Fax <br />(970)929-5177 <br />R~~~IV~D <br />April 15, 2008 <br />Mr. Jason Musick Div~sw~, ,,, „aciamatlOn, <br />Environmental Protection Specialist Mining and Safety <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: NOI X-2006-223-07, Exploration Proiect Update, Oxbow Mining, LLC. <br />Dear Mr. Musick, <br />The purpose of this letter is to provide an update to the subject 2006 NOI. <br />Approved Program Update <br />1. ECM-04-33 - No activity occurred during 2006 or 2007. We will not pursue this <br />borehole any further. <br />2. ECM-04-38 -Drilled in 2006 and plugged, graded and seeded. A borehole completion <br />report was sent previously in March 2007. <br />3. ECM-OS-19 -During 2006, the pad was built, borehole pre-collared and drilled to <br />corepoint. A preliminary borehole completion report was sent in March 2007. While <br />drilling is expected to be completed during 2007 a core drill capable of pulling core from <br />depth never became available. We anticipate completing this borehole in 2008. <br />4. ECM-OS-23 -During the 2006, the pad was constructed but the borehole not drilled due <br />to weather. An initial borehole completion report was provided in March 2007. Drilling <br />was expected to be completed during 2007 but no rig capable of pulling core at depth <br />was available. Drilling is expected to be completed in 2008. <br />5. ECM-OS-24 -During 2006, the drill pad was constructed but no drilling took place due to <br />lack of drill rigs. Drilling was started in 2007 and resulted in exceptional problems. The <br />drill bit was stuck on the first attempt and the casing had to be sheared with explosives. <br />The second attempt was successful to 1000' and abandoned due to substantial early <br />winter weather and the site had to be abandoned. The Federal coal exploration license <br />expires on May 18, 2008 and drilling will likely resume after further discussions with <br />USFS and BLM authorities. The fact that the site lies within a USFS Inventory Roadless <br />Area could complicate the issue. A preliminary completion report is attached. <br />6. ECM-OS-34 - No activity occurred during 2006 or 2007. If rigs are available, the site <br />could be drilled in 2008. <br />• Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.