My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-18_HYDROLOGY - C1980004 (2)
>
Day Forward
>
Hydrology
>
Coal
>
C1980004
>
2008-04-18_HYDROLOGY - C1980004 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:06 PM
Creation date
4/21/2008 9:59:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
HYDROLOGY
Doc Date
4/18/2008
Doc Name
2008 Annual Impoundment Inspection
From
J.E. Stover & Associates Inc
To
DRMS
Permit Index Doc Type
Prof Pond Certifications
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McClane Canyon Mining, LLC <br />McCLANE CANYON MINE <br />IMPOUNDMENT YEARLY INSPECTION <br />In accordance with Rule 4.05.9(14), all impoundments shall be inspected at least yearly <br />to determine if the impoundment has been maintained as designed, and in accordance <br />with the approved plan and the applicable regulations. This yearly inspection is for the <br />impoundment located at the McClane Canyon Mine. <br />On April 3, 2008, I performed the required yearly inspection. I, J. E. Stover, have a <br />wide variety of experience in the design and construction of earth fill embankments. <br />Nothing was observed during the inspection that would indicate the pond has a <br />potential for failure. There was no appearance of erosion, instability, structural <br />weakness or other hazardous conditions. There are no required monitoring procedures <br />or instrumentation other than monthly and yearly inspections. There are no aspects <br />which might affect stability and there is no required maintenance. The sediment pond <br />had water standing at the top of the primary spillway at approximate elevation of <br />5457.75. <br />The required capacity of the sediment pond is 0.55 A-F. The required water capacity of <br />the sediment pond is 0.36 A-F and the required sediment capacity is 0.19 A-F (ref. PAP <br />Section 2.4.1 and Table 4.2-12). The actual size of the pond exceeds the required <br />capacities listed in the permit. <br />The sediment pond has the following estimated capacity based on the existing water <br />level in the pond: <br />POND CAPACITY -ACRE FEET <br />Water Sediment Total <br />(0.95 Max) <br />0.64 (50% of 0.28) <br />0.14 0.78 <br />~~~~~~ <br />To the best of my knowledge and belief, the i~~o~n~ie~6~ediment pond at the <br />McClane Canyon Mine has been maintaine~~~~~desigri~d`; in accordance with the <br />approved plan and applicable regulationsD ®®~"~~ '~ ~'~~ <br />~a°~. <br />James E. Stover ~~ ~ `~ `~, ~ Date <br />Colorado Professionalgin er _ . p <br />Registration No. 19230 '~~ ,~r ' ~~ <br />-- _ ...:~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.