Laserfiche WebLink
CAM Mining LLC <br />MONGER CANYON MINE <br />IMPOUNDMENT YEARLY INSPECTION <br />In accordance with Rule 4.05.9(14), all impoundments shall be inspected at least yearly <br />to determine if the impoundment has been maintained as designed, and in accordance <br />with the approved plan and the applicable regulations. This yearly inspection is for the <br />impoundment located at the Munger Canyon Mine. <br />On April 3, 2008, I performed the required yearly inspection. I, J. E. Stover, have a <br />wide variety of experience in the design and construction of earth fill embankments. <br />Nothing was observed during the inspection that would indicate the pond has a <br />potential for failure. There was no appearance of erosion, instability, structural <br />weakness or other hazardous conditions. There are no required monitoring procedures <br />or instrumentation other than quarterly and yearly inspections. There are no aspects <br />which might affect stability. The pond/impoundment was not discharging during the <br />inspection. <br />There pond was dry. <br />POND CAPACITY -ACRE FEET <br />Water Sediment Total <br />0.41 0.19 0.60 <br />~ :~ <br />To the best of my knowledge an~~ie r~`poundment at the Munger Canyon Mine <br />has been maintained as desi~and i~r~cao~nce with the approved plan and <br />applicable regulations. ~~pc ~~ ~ -~~~_~~~ <br />,^J.} <br />~ ~-~ 5, ~'L-' ., a ~ <br />® 3 <br />a'&~p9 © 1 • ' ~e~ <br />°1c W APJ ..O j ~ his <br />James ~~oV~i'E ~~~pa Date <br />Colorado Profie~~~f'~ngineer <br />Registration No. 19230 <br />