Laserfiche WebLink
3B Enterprises <br />"Deakins Pit" <br />Exhibit "D" <br />Mining Plan <br />A) Mining operations will consist of 6" -12" of topsoil to be removed and stockpiled <br />2' - 6' of overburden to be removed and used in reclamation of slopes gravel to <br />be mined and processed on site. <br />B) 2 feet - 6 feet of overburden/topsoil will be removed to expose gravel deposit. <br />Q Water will be discharged from mine and used for irrigation purposes. <br />D) 15 acres <br />18 acres additional to East Pit to begin summer of 2008 and run until 2011 or until <br />gravel deposits are depleted. The West Pit (22.5 acres) will be opened up upon <br />the completion of grading of the East Pit and is expected to have approximately a <br />10 year life. <br />F) i 15 feet of pit run gravel to be mined at site. <br />ii Shale is at the bottom of the gravel seam. <br />G) Primary commodity is river rock gravel to be used in construction materials. <br />Secondary commodity to be fill dirt. <br />H) Pit run to be used in production of construction materials.