Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />Description <br />~ Total Fleet Size Haul Trip Return Trip <br />ICosUhour/unit (No. units) Cost/hr/fleet CosUhr/fleet <br />EQUIPMENT HAUL DISTANCE and TIME <br />Subtotals <br />sheet 2 of 2 <br /> Nearest major city or town within project area region : Las Animas <br />Transportation ~cle Time : Non- Total one-way travel distance : 16.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul lime (hours) = 0.46 0.46 Total non-roadable mob/demob cost ' : ~ 1,118.06 <br />Return time (hours) = 0.46 ~ 0.46 'two round Ines with haul ng <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost " : ~O.OU <br />Unloading time (hours) = 0.50 NA •• one round tnp, no haul ng <br />Subtotals = i.91 0.91 <br />JOB TIME AND COST Tota- job time : 3.$3 hours <br /> Total job cost : x1,118 <br />