Laserfiche WebLink
Bowie Mine Gob Pile Stability <br />2005126-CMT <br />NUMBER Embankment gob- gob pile <br />Nos. 1 and 4 <br />198 (PT#4279 N19417.071/E36234. <br />199 (PT#4280 N19446.700/E36414. <br />200 {pT#42$1 N19433.461/E36493. <br />195A (PT#4276) N19489.176/E36596. <br />MOISTURE /DENSITY SPECIFICATIONS <br />90% + Cohesive Soils X <br />Cohesionless Soils <br />N/A Cohesive Soils <br />Cohesionless Soils <br />= • ' GEOTECH Client / On Site Rep: <br />.........................................:.::::::::::::::::::::::::::::::~:.: Bowie Resources - B. Bear <br />CiviE, Structurat & Geotechnicai Engineers Contractor /Rep: <br />222 South Park Ave. • Montrose, co syao~ Load Out Services - S. West <br />Ph.: (B701 249-b828 • FAx: (970) 249-0945 Technician: <br />CONSTRUCTION MATERIALS TESTING iIABORATORY L. Sanchez <br />DAILY COMPACTION REPORT <br />GRADE ELEV TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERC{:N7 N07 SOIL LAB SAMPLE <br />NUC SAND DENSITY MOISTURE DENSI-lY CONTENT COMPACTION WfrH(N TYPE NUMBER <br />(pcf) CONT. (%} (pct] (%} SPEC <br />6194.8 X .....98.3 12.0 94.1 13.2 4S 7 nr~t, a~~g s ° <br />6190.0 X <br />6185.5 X <br />5179.7 X <br />OBSERVATION /TESTING <br />Time: <br />Time: <br />ier of Site Visits/Day: <br />ing Oniy: <br />rested By (Company Name): <br />Bowie Resources - B. Bear <br />~ Testing -- <br />ASTM-698 Cohesive Soils X <br />Cohesionless Soils <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />Not Working Due To: The Contractor Is: <br />lnsuiticient amount <br />of material placed. <br />Clement Weather: Processing Frozen Material: processing Wet Material• <br />luipment Maifunction; Shipping and/or Grubbing: Moisture Conditioning pry MaYI: <br />IknoWn: Stockpiling Fill: ~~Removing Unsuitable Mat'!: <br />! ~~ <br />05-126-CMT Bowie Mine Gob Pile Stabiiity.xis DCR3-4-08#198-ap/sj <br />.7 10.2 92.5 14.3 92. <br />.0 9.$ 91.9 11.7 91. <br />.8 11.5 84.1 16.0 85. <br />FIELD OBSERVATIONS <br />Date: ~ <br />Day: S M T W Th F 5 <br />X <br />Weather: Sun Clear Overcast Rain Snow <br />X X <br />Temp: To 32 32-SO 50-70 70-85 85 Up <br />X ~ <br />Wind: Still Mod High <br />X = <br />Humidity: Dry Mod Humid F <br />X <br />[nformed (Rep of Company) of Test Results: <br />Load Out Services - Ty Hyatt <br />=1eld Copies Given To: <br />IEnt: <br />/ Or/c@13/o <br />9/60 r/c @29% <br />9/60 r/c @33% <br />Ipaction Equipment Used: <br />cps€oot: <br />>th Drum Roller: <br />story: <br />r (List Below}: <br />Traffic <br />Buckhorn was not informed prior <br />to our arrival on site that the <br />contractor would not be working <br />on this date. <br />PAGE ? OF <br />