Laserfiche WebLink
Project: Client / On Site Rep: <br /> <br />Bowie Mine Gob Pile Stability ~ ~ ' G E~TEC H Bowie Resources - B. Bear <br />Contractor /Rep: <br /> <br />Pra~eCt No: Date: <br />2005126-CMT 2/13/2008 CNiL, STRUCTURAL & GEOTECHNiCAL ENGINEERS <br />CONSTRUCTION MATERIALS TESTING LABORATORY Load Out Services -Steve West <br />Technician: <br />L. Sanchez <br /> DAYLY COMPACTION REPORT <br />LOCATION <br />TEST Embankmant Gob on <br />NUMBER <br />Gob Pile Nas. 1 and 4 <br />195 (PT#4276 Ni9430.462/IE36492.$58 <br />196 PT#4277 N19489.834/E36360.477 <br />197 (PT#4278 N19425.343/E3635Z.885 TESTTYAE MAX DRY OPTIMUM DRY <br />GRADE ELEV <br />NUC SAND DENSITY MOISTURE DENSITY <br />(pcf) CO1VT-, (%) (pcf) <br />6184.$ X 9i.8 8.5 79.5 <br />5193.8 X 100.3 9.0 $9.8 <br />6193.1 X 98.8 11.5 93.4 MOISTURE PERCf:t`iT rvoT SOIL LA$ <br /> <br />CONTENT COMPAC170N WITHIN TYPE SAMPLE <br />(%) saEC NUMBER <br />15.3 86.6 X gob 4230/31 r/c @28% <br />17.$ 90.0 gob 42s9/6o r/c @37% <br />12.7 94.5 gab 4259/60 r/c @17% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE /DENSITY SPECIFICATIONS OBSERVATIO N /TES TING FIELD O BSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction 90% + Cohesive Soils X <br />Requirement: Cohesionless Soils Full Time: ~ Day: S M T W <br />X Th F S <br /> <br />Sheepsfoot: <br /> Part Time: Weather: Sun Clear Overcast Rain Sno <br /> <br />peafied <br />X w <br />Smooth Drum Roller: <br />Moisture n/a Cohesive Soils X <br />Requirement: Cohesionless Soils Number of SItC Visits/Day: ~ <br /> <br />Testing Only: ~ Temp: <br /> <br />Wind: To 32 32-50 <br />X <br />Still 50-70 70-85 85 Up <br /> <br />Mod High <br />Vibratory; <br /> <br />Laboratory Testing A$TM ` Cohesive Soils X <br />Procedure: 6g8 Requested By (Company Name): <br />Bowie Resources - B. Bear <br />Humidi <br />t`/ <br />D <br />ry X <br /> <br />Mod Humid Other (List Below); <br /> <br />Haul Traffic <br />Cohesionless Soils X <br />DEN5TTY / COMPACTION TESTING WAS NOT PERFORMED Insufficient amount of Informed (Rep of Company) of Test Results: <br />ON THIS PATE FOR THE WLLOWING REASONS: material placed. Loa d Out Services - Ty Hyatt Buclchorn was not informed prior <br />Contractor Not Working Due To: The Contractor Is: to our arrival on site that the <br /> <br /> <br /> <br />nclement Weather: <br /> <br />Processing Frozen Material: <br /> <br />~pracessinq Wei Material: <br />Field Copies Given To: contractor would not be working <br />on this date. <br /> <br />Equipment Malfunction: <br />Slipping and/or Grubbing: <br />Moisture Condirioning Dry MaYI: Contractor: <br />Client: <br /> <br /> <br />Unknown: <br />Stockpiling Fill: <br />Removing Unsuitable MaYI: CM/GM: <br />Other: PAGE i OF 1 <br />v~-~2b-~ni1 J-Bowie Mine Gob Pile Stability.xlsDCR2-13-08/s#995-sj <br />