Laserfiche WebLink
JUL-12-2006 13:43 National King Coal LLC <br />P.02 <br />Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year~ao~ <br />iyc~ ~ G G~ A L G - r 4 ~ ! - a 3 5 ,v~ ~~,v~ c- K~~6 coq G , ~~ e <br />mine name permit # Permitiee <br />Address: ~/~la.df r.2 ~a0 ~G~5~~1~us C ~ '~r3Z ~ <br />This report, required by Rule 2.04.13, is due by February 15 of eadi year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approv®d permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br />~~~~ - <br />Land Status Catego t.ast Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed / 0 r + O = ~ 8 <br />Acres backfilled and raded O, 5 + Q _ - O. ~ <br />Acres topsoiled _ .-, ~ r S ,+ _ ~ _ ®!-f•~" <br />Seeding iypically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each cate~c~ below. Do not include acres that have achieved final, Phase III release. ,__ <br />-~ Last Years This - ~~ Greater <br />Cumulative Calendar Cumulative 10 years or than 10 <br />Total near Total' less years' <br />Acres seeded' _ ~;~ 5 ~ + ~ _O ~ _ ~ G, 5 ~ _ ~ b. 5 I .± ~ ~ l <br />"'include, if necessary, a description of any~augmented seeding or cultural practices <br />For the Entire .Life of Mine, th® total number of acres disturbed ! C. ~$ and the total number of acres: <br />Phase I released ,~ ~_ Phas®I I released C~ Phase II I released <br />For Mines in Permanent Cessation; <br />Total acreage in facilities subject to reclamation but yet to be completed N ~ „y._, <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z ~[~ ~~ _ <br />Acreage in active mining areas~3 I OJ ~~ <br />'(exclude acres where Phase III release has boen acltlevedl <br />' Incudes Haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage end construction areas; <br />office area, repair shops, and parking: coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse plies, coal mine waste Impoundments, head•of•hollow fills, and valley tills: ventilation shaHs and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combusl(on by-products disposal areas). <br />' Includes pits, topsoil stripped areas In advance of pits, and spoil not backtilled and gratlad <br />