My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-04-12_GENERAL DOCUMENTS - M1999002
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1999002
>
2005-04-12_GENERAL DOCUMENTS - M1999002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:11 PM
Creation date
4/14/2008 10:07:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
4/12/2005
Doc Name
Major modification
From
US Environmental Protection Agenty
To
American Soda L.L.P.
Email Name
CBM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the permittee shall remain in effect for the duration of this Permit, unless part (b), <br />below, has been complied with. <br />(b) The permittee may, upon written request to EPA, change the type of financial <br />mechanism or instrument utilized. A change in demonstration of financial <br />responsibility must be approved by the Director. A minor Permit modification <br />shall be made to reflect any change in financial mechanisms, without further <br />opportunity for public comment. <br />2. Insolvency of Financiallnstitution. In the event that an alternate demonstration <br />of financial responsibility has been approved under (b) above, the permittee must <br />submit an alternate demonstration of financial responsibility acceptable to the <br />Director within sixty (60) days after either of the following events occur: <br />(a) The institution issuing the trust or f nancial instrument files for bankruptcy; or <br />(b) The authority of the trustee institution to act as trustee, or the authority of the <br />institution issuing the financial instrument, is suspended or revoked. <br />3. Cancellation of Demonstration by Financial Institution. The permittee must <br />submit an alternative demonstration of financial responsibility acceptable to the <br />Director, within sixty (60) days after the institution issuing the trust or financial <br />instrument serves 120-day notice to the EPA of their intent to cancel the trust or <br />financial instrument. <br />PART III. GENERAL PERMIT CONDITIONS <br />A. EFFECT OF PERMIT <br />**~ <br />APPENDIX I (Groundwater and Surface Water Monitoring Plan) <br />~~* <br />APPENDIX J (Subsidence Monitoring Plan) <br />**~ <br />IS MODIFIED TO READ: <br />PART II. SPECIFIC PERMIT CONDITIONS <br />FINAL: Modification No. 9, UIC Area Permit No. C030858-00000 <br />Page 6 of 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.