My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-11_INSPECTION - M1997086
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1997086
>
2008-04-11_INSPECTION - M1997086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:27:24 PM
Creation date
4/11/2008 1:36:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997086
IBM Index Class Name
INSPECTION
Doc Date
4/11/2008
Doc Name
Insp Rpt
From
DRMS
To
Siloam Stone, Inc.
Inspection Date
3/24/2008
Email Name
DEG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />the Application as Peck Creek Tributary and notifies the homeowners' association and the public <br />and submits the results to the Division for review and to the Board for approval. <br />9. The testimony and exhibits and legal argument presented by Mueller and the Division <br />are persuasive on the advisability of requiring Mue{ler to commit to notifying the surface owner <br />upon discovery of cultural and historic resources and to giving the surface owner a reasonable <br />amount of time to act with diligence to record these resources with the Colorado Historic <br />Preservation Officer and recover them. <br />l . The Board's authority to review an application for a permit is set forth in §§ 34-32.5- <br />115(4) and 34-32.5-1 l6, C.R.S. (1997). <br />2. The Siloam Stone Pit Application meets the requirements of §§ 34-32.5-112, 34-32.5- <br />1 iS(4) and 34-32.5-116, C.R.S. (1997) and all applicable Construction Materials Rules and <br />Regulations. <br />3. Because Ferd Mueller's Application conforms to the requirements set forth above and <br />further because Eerd Mueller has agreed to comply with the terms of the conditions and <br />stipulations set forth below and incorporated into this Order as conditions upon which it is <br />granted, the Board has no grounds upon which to deny the Application. <br />The following conditions and stipulations shall be incorporated into and made part of this <br />Order: <br />(1) There shall be no mining operations within the "buffer zone," including rock picking <br />and slab mining, unless and until Mueller submits a blasting plan; notifies the surface owners and <br />the public, by publication in a local newspaper; gets Division approval; and is given Board <br />authorization following a formal public hearing. <br />(2) There shall be no mining operations, including rock picking and slab mining, within <br />the "buffer zone" unless and until Mueller submits a hydrologic impact analysis for the area <br />identified in the Application as Peck Creek Tributary; notifies the surface owners and the public. <br />by publication in a local newspaper; gets Division approval; and is given Board authorization <br />following a formal public hearing. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.