Laserfiche WebLink
Support Facilities <br /> No problems were found in the following areas: materials storage bench, barrel storage building, <br /> hydraulic components storage,the Sylvester Gulch mine water pumping facility,polishing pond, and <br /> electric substation. <br /> Topsoil <br /> Topsoil stockpiles were properly marked in the surface facilities area(next to the coal stockpile) and in <br /> upper Sylvester Gulch. <br /> Offsite Support Facilities <br /> Snow cover prevented access to the Corrals laydown/staging area, Deer Creek Shaft, and the borrow <br /> area for the Monument Dam work. <br /> Documents Received <br /> One document was received during the inspection, the signed decision form for PR-12. <br /> 4 <br />