ds Permit # M - Zoe 6 - 673 Confidential? /Vo
<br />g
<br />FP - , i I class T se `' ° GRAPHIC SCALE
<br />�( MV# Inspection Date
<br />d' - Doc Date (if no date stamp) Vi t /0 ki
<br />sao o xso 5w 11000 Doc Name pI of P 11,,, FRESHWATER POND
<br />A \ APPROX. 5 ACRES
<br />PROPOSED ACCESS � � '�, From DRM ! La F- �-,, e ( )
<br />To( i 1 ZOther IRA4 S (SEE NOTE 7) PROPOSED VEGETATION ( IN FEET )
<br />PROCESSING PLAN NOTES: ACCEURA N / DEC) RIiTION LINES Recipients 1 loch = soo tr.
<br />1, SCOPE OF PROPOSAL THIS PLOT PUN INCLUDES SUBJE TTO YYARRANTS.AND (SEE LANDSCAPE ANALYSIS BELOW) =
<br />INFORMATION FOR BOTH MINERAL EXTRACTION ZONING REVIEW DE APPROVAL,BY CDOT �� ^\ CONTOUR INTERVAL 5'
<br />AND BATCH PLANT ZONING REVIEW. THE BASE PROPOSAL IS AND`'/ OR EL P 0. / COUNTY
<br />FOR MINERAL EXTRACTION, BATCH PUNTS ARE FLOODPLAIN MINING SUBJECT TO
<br />SUPPLEMENTARY TO THIS USE. BATCH PUNTS ARE NOT / RECEIVED ^� APPROPRIATE APPROVALS
<br />PROPOSED AS A STAND -ALONE USE. -
<br />2. STRUCTURES. STRUCTURES TO BE INSTALLED AT THEJAN 3 1 2008 \ I,
<br />SPECIAL USE SITE MAY NOT HAVE ENCLOSURE OR r
<br />OCCUPANCY THAT WOULD QUALIFY SUCH STRUCTURE AS A ( 4PIKOGamelfOrl, q -- 1P RECOVERY OF CONSTRUCTION
<br />'BUILDING" FOR THE PURPOSES OF ZONING. THE APPLICANT ``�. '� hOIfAIIP ` P P MATERIALS TO NEAR - VERTICAL
<br />HAS INCLUDED SCALE, HEIGHT AND BULK, INFORMATION FOR SLOPES (SEE DETAIL)
<br />PROPOSED PUNTS, PROCESSING EQUIPMENT, AND OTHER
<br />STRUCTURES. IN GENERAL, THE SITE IS ANTICIPATED TO `
<br />REPLACE THE PROXIMATE LAFARGE FOUNTAIN FACILITY, AND - --
<br />EQUIPMENT AT THE PROPOSED SITE WILL BE SIMILAR IN EXISTING RIPARIAN CANOPY
<br />SCALE. THE SCALE HOUSE AND OTHER FULLY ENCLOSED 9? q (SEE LANDSCAPE ANALYSIS BELOW)
<br />OPERATIONS FACILITIES ARE ANTICIPATED TO BE SUBJECT TO
<br />BUILDING PERMITS AND WILL BE PERMITTED APPROPRIATELY.
<br />3. RELATIONSHIP TO OTHER PROPERTIES. THE SUBJECT \ _ \ _ _.
<br />PROPERTY IS ACCESSED FROM A SMALL FRONTAGE ROAD
<br />ALONG OLD PUEBLO ROAD, NEAR INTERSTATE 25 EXIT 122. \ „ `
<br />WITHIN THE VICINITY OF THIS FRONTAGE, ACCESS AT AN y�w ' �`�°• .� �...
<br />EXISTING DRIVEWAY IS THE ONLY PROPOSED USE. MINERAL -
<br />dA
<br />RECOVERY AND RELATED USES ARE CONFINED TO THE
<br />\
<br />INTERIOR OF THE SITE, WHICH IS SURROUNDED ON ALL SIDES
<br />BY A BUFFER OF EXISTING PRIVATE AGRICULTURAL PARCELS. `� i /'
<br />,
<br />THE SAND AND GRAVEL OPERATION IS ALSO SURROUNDED BY /' ���..�•�\ .�
<br />AN
<br />RIGHTS-OF-WAY TY
<br />IPCALLYY COR
<br />E PARATED FROM WETLAN D AVOIDANCE
<br />B
<br />PU
<br />SITE BY A \ -t° < ,_ _ __ A
<br />W
<br />DISTANCE OF 500 FEET OR GREATER. ;� ', (SEE y SEE NOTE 5
<br />4. VEHICULAR AREAS. PARKING AND ACCESS AREAS WILL BE SCALE HOUSE \ �-. \ FP -
<br />PAVED TO ELIMINATE OR OTHERWISE MINIMIZE DUST AND °\ \
<br />OFF -SITE SEDIMENT ACCUMULATION FROM TRAFFIC TO AND r
<br />FROM THE SUBJECT SITE. PARKING HAS BEEN PLANNED TO W a / ae . \'
<br />ACCOMMODATE UP TO 20 EMPLOYEES AND VISITORS AT ANY
<br />ONE TIME. TRUCK TRAFFIC WILL BE CONTINUOUSLY FLOWING SCREENING BERM MADE FROM a
<br />DURING OPERATIONS, BATCH PUNTS ARE LOCATED TO �. D
<br />EFFlCIENR OVERBURDEN FROM CELLS 1 -3 Y HANDLE LOADING OF TRUCKS. WITH 2:1 SLOPES \ e P
<br />5. NATURAL AND HISTORIC FEATURES. WATERCOURSES ON THE
<br />SITE AND IN ADJACENT AREAS GENERALLY FALL WITHIN THE ACCESS ROAD
<br />JURISDICTIONAL FLOODPLAIN (SEE PLOT PLAN). A SURVEY , ,
<br />OF HISTORIC DATA REVEALED NO SIGNIFICANT FEATURES OF a
<br />NATURAL OR CULTURAL SIGNIFICANCE WITHIN THE AREA TO \ R �.
<br />PROCESSING AREA ^^
<br />BE AFFECTED BY MINING AND RELATED OPERATIONS. (SEE DETAIL) \ e A
<br />6. LANDSCAPE CONTEXT. THE PROPOSED USE IS A TEMPORARY �.
<br />USE, AND THE RECLAMATION PUN CALLS FOR LAND TO BE SILTATION AREA \ PH SE
<br />RETURNED TO PRODUCTIVE USE AS EITHER RANGELAND OR (FOLLOWING RESOURCE EXTRACTION)
<br />WATER STORAGE SUBSEQUENT TO MINING. URBAN
<br />LANDSCAPE STANDARDS ARE NOT AT THIS TIME FORESEEN AS (194.3 A ES)
<br />APPROPRIATE FOR THOSE USES, AND THOSE USES MAY BE 25 SETBACK TYP.
<br />SUBJECT TO FURTHER REVIEW UPON THE EXPIRATION OF THE (SEE NOTE 5)
<br />RECLAMATION PERMIT. LANDSCAPE FOR TEMPORARY
<br />SCREENING AND BUFFERING IS DISCUSSED IN DETAIL ON TWO
<br />If
<br />SEPARATE SHEETS, ENTITLED LANDSCAPE ANALYSIS AND
<br />VISUAL ANALYSIS. 75' SETBACK BETWEEN MINED
<br />SLOPES AND STOCKPILES (TYP.) " FP \ !
<br />7. PHASING. TWO PHASES WILL BE EMPLOYED IN THE
<br />l I 4 d/
<br />PROPOSED MINERAL EXTRACTION OPERATION. THE FIRST ;.
<br />PHASE WILL INCLUDE INITIAL OPERATIONS TO ESTABLISH THE SCREENING BERM MADE FROM OR S 9
<br />PROCESSING AREA, FRESHWATER POND, AND MINING ON THE CONVEY
<br />OVERBURDEN FROM CELLS 1 -3 t` LL\ `, OVER D INAGE `•
<br />NORTHERN END OF THE PROPOSED SPECIAL USE AREA. THE WITH 2:1 SLOPES `
<br />SECOND PHASE CONSISTS OF APPROXIMATELY THE SOUTHERN
<br />HALF OF THE SUBJECT SITE. COLLECTIVELY, THE LIFE OF
<br />THE MINE IS ANTICIPATED TO BE 15+ YEARS, DEPENDING ON
<br />MARKET CONDITIONS, WITH APPROXIMATELY HALF OF THE LIFE N,\ \
<br />f s� = �
<br />OF THE MINE IN EACH PHASE.
<br />LIVESTOCK OPERATIONS SO
<br />B. OUTSIDE STORAGE. IS E. STORAGE OF FUELS AND ADDITIVES FOR
<br />CONCRETE AND/OR ASPHALT MANUFACTURING INTEGRAL TO
<br />THE STRUCTURES FOR THOSE MANUFACTURED PRODUCTS. A LONG AS FEASIBLE eP i as 4.
<br />SEPARATE DIESEL TANK MAY BE INCLUDED ON THE SITE -
<br />WITHIN THE PROCESSING AREA FOR GENERAL FUELING If
<br />OPERATIONS. SUCH FUELING AND STORAGE SHALL BE ii % e �► \
<br />PERMITTED UNDER THE AUTHORITY OF MSHA, CDPHE, AND "`
<br />OTHER APPLICABLE AUTHORITIES. NO HAZARDOUS MATERIALS '' G,a fP =�j /'` ! \'�•
<br />WILL BE STORED OR USED IN THE OPERATION; THE SITE
<br />(SUBJECT TO CERCU / RCRA REGULATION) WILL INVOLVE
<br />THE USE OF PETROCHEMICALS (FUELS; LUBRICANTS) IN
<br />ACCORDANCE WITH APPLICABLE LAWS. - _ a we
<br />� I
<br />FOUNTAIN CREEK — _ _
<br />r "
<br />9
<br />J ` d
<br />PH E 11 B �
<br />WATER STANDPIPE / y �v �/ (194.7 ORES)
<br />EMERGENCY WATER
<br />�FQ ®A�
<br />ACCESS ROAD AND CONVEYOR
<br />(SEE NOTE 6)
<br />POND
<br />I
<br />74 ASPHALT PLANT (OP NAL) 1200' 1
<br />(APPROX. 64.5' HIGH)
<br />,%
<br />290 \ 100' SETBACK FROM UTILITY EAS WENT
<br />S ACKv CONCRETE PUNT (OPTIONAL) `
<br />MINE TO FINAL RECLAMATION SL ES
<br />(APPROX. 30' HIGH) "\ ADJACENT TO LATTICE TOWER
<br />`SITE ACCESS �v �.
<br />% V 100' SETBACK FROM U LITY EASEMENT
<br />10, MINE TO FINAL REC ATION SLOPES F
<br />A ADJACENT TO U CE TOWERS
<br />PHASE A
<br />SETBACK ° (39.5 AC S)
<br />OVERBURDEN
<br />9
<br />TOPSOIL \�� �..._. .._...- ...- ..._...- ...- ..._...- �
<br />>> SCREENING BERM °\ 210'
<br />q
<br />p D ?o
<br />\`
<br />-- - -- 65' OFFSET TO 6'
<br />Ulf
<br />I °v
<br />®; HIGH SCREENING BERM
<br />AGGREGATE PROCESSING
<br />EMERGENCY ACCESS ROUTE
<br />(MAX. HEIGHT 51') o �'
<br />(OLD PUEBLO ROAD) i1
<br />�. 25' SETBACK TYP. FUEL STORAGE
<br />v1 • SHOP
<br />i
<br />- ,i
<br />de
<br />EXISTING INDEX CONTOUR
<br />�.�.�.�.�.�.�•�•�•�•� PERMIT BOUNDARY
<br />EXISTING INTERMEDIATE CONTOUR
<br />I
<br />PROPOSED INDEX MINING CONTOUR
<br />W
<br />PROPOSED INTERMEDIATE MINING CONTOUR
<br />PAVED ROAD
<br />EXISTING RIPARIAN CANOPY
<br />- - -_ -_ UNPAVED ROAD
<br />EXISTING STRUCTURE
<br />PAVED (BITUMINOUS) SURFACE
<br />®
<br />EXISTING WATER WELL
<br />01
<br />POTENTIAL DEWATERING
<br />TRENCH
<br />GENERAL NOTES:
<br />° EMPLOYEE BUILDING
<br />" I. BASE INFORMATION TAKEN FROM TOPOGRAPHICAL SURVEY
<br />OF THE SUNDANCE ASSOCIATES, DATED 2006 AND I R
<br />REVISED E
<br />28, 2006.
<br />\ " ° 2. FLOODPLAIN INFORMATION SHOWN FROM FLOOD INSURANCE
<br />�� _ RATE MAPS FIRM PANEL NUMBERS; 08041C1160 F,
<br />" . //
<br />0804
<br />DATE MARCH 17, 1997 90 ALL
<br />PROCESSING AREA DETAIL
<br />\ -� ,' FLOOD ELEVATIONS NOT SHOWN. ZONES A AND AE ARE
<br />SCALE: 1' =200'
<br />". REGULATED BY EL PASO COUNTY, COLORADO. ZONE X IS
<br />\ NOT REGULATED.
<br />DEWATERING TRENCH (AS NEEDED)
<br />MINE TO NEAR VERTICAL SLOPES TO
<br />OPTIMIZE RESOURCE RECOVERY
<br />SIDE SLOPES SUBJECT TO CONCURRENT
<br />RECLAMATION (SEE NOTES)
<br />PIT FLOOR AT APPROX. 25'JIEPTH
<br />NO ESt SHALE BEDROCK
<br />1.
<br />CONCURRENT RECLAMATION WILL OCCUR AS OVERBURDEN MATERIALS
<br />ARE MOVED FROM FUTURE MINING AREAS. THE OPERATOR MAY REPLACE
<br />MATERIAL IN SIDE SLOPE OR IN LIFTS TO OTHER FINAL GRADING, AS
<br />2, INDICATED ON EXHIBIT F.
<br />THE OPERATOR MAY MINE TO FINISHED SLOPES OR REPLACE
<br />OVERBURDEN IN TEMPORARY BACKFILL FEATURES, CONTAINMENT FOR
<br />SILTATION PONDS AND OTHER WATER MANAGEMENT FEATURES.
<br />TYPICAL EXCAVATION SIDE SLOPE
<br />NOT TO SCALE
<br />LEGEND
<br />SEED SEED
<br />6" TRENCH TO
<br />COLLECT SEDIMENT
<br />NOTE: A SUFFICIENT QUANTITY OF TOPSOIL
<br />SHALL BE STOCKPILED TO ACHIEVE FINAL
<br />RECLAMATION, AS SHOWN ON EXHIBIT F,
<br />WITH 6- INCHES OF TOPSOIL ON ALL
<br />RECLAIMED LAND SURFACE AREAS.
<br />OVERBURDEN / TOPSOIL STOCKPILES DETAIL
<br />NOT TO SCALE
<br />SECTION LINE
<br />EXISTING INDEX CONTOUR
<br />�.�.�.�.�.�.�•�•�•�•� PERMIT BOUNDARY
<br />EXISTING INTERMEDIATE CONTOUR
<br />EASEMENT / R.O.W.
<br />PROPOSED INDEX MINING CONTOUR
<br />MINING LIMITS
<br />PROPOSED INTERMEDIATE MINING CONTOUR
<br />PAVED ROAD
<br />EXISTING RIPARIAN CANOPY
<br />- - -_ -_ UNPAVED ROAD
<br />EXISTING STRUCTURE
<br />PAVED (BITUMINOUS) SURFACE
<br />®
<br />EXISTING WATER WELL
<br />RAIL ROAD
<br />EMERGENCY / FIRST AID
<br />FENCE
<br />o
<br />PROPOSED VEGETATION
<br />OVERHEAD POWER LINE
<br />o
<br />PROPOSED DOWNCAST OUTDOOR LIGHTING FIXTURES
<br />UNDERGROUND WATER LIIINE
<br />ACCESS EASEMENT
<br />UNDERGROUND UTILITY LANE — F -- FP
<br />— FP — FP
<br />— FP — M
<br />100 -YR FLOODPLAIN
<br />UNDERGROUND GAS LINE: -- dd —
<br />de — dd --
<br />de — de
<br />_ ... - ... - ... _ ... _ ... _ ... - ... _ DITCH / WATERWAY
<br />JURISDIC WETL ANDS
<br />VEG ETATION ANALYSIS:
<br />1. VEGETATION ON THE SUBJECT PROPERTY IS DESCRIBED
<br />IN EXHIBIT J OF THE REGULAR 112 PERMIT
<br />APPLICATION. IN GENERAL, SIGNIFICANT EXISTING
<br />VEGETATION IS FOUND ONLY AT THE FRINGES OF THE
<br />SITE, OUT OF THE PROPOSED AFFECTED AREA, DUE TO
<br />THE PRESENCE OF AGRICULTURE AND CATTLE
<br />PRODUCTION ON THE SITE.
<br />2.THE AFFECTED AREA WILL AVOID ANY SIGNIFICANT
<br />EXISTING VEGETATION. THE ISOLATED WETLAND WEST OF
<br />PHASE 1, ABUTTING THE RAILROAD TRACKS IS A
<br />FORMER STOCKWATER OR SUMP POND (AND MAY NOT
<br />PREPARED BY:
<br />ON BANKS AND GESSO, LLC.
<br />■■ 720 KIPLING ST., SUITE 117
<br />LAKEWOOD, COLORADO 80215
<br />(303) 274 -4277
<br />BE JURISDICTIONAL), AND WILL BE BUFFERED BY AT
<br />LEAST 25 FEET OF NO DISTURBANCE UNDER THE
<br />PERMIT. THE ISOLATED WETLAND ALONG THE NORTHERN
<br />EDGE OF PHASE 2 WILL ALSO BE BUFFERED BY 25
<br />FEET RELATIVE TO ALL OPERATIONS.
<br />3. TO THE EAST AND NORTH OF THE AFFECTED LAND, THE
<br />FLOODPLAIN OF THE FOUNTAIN CREEK SUPPORTS A
<br />CANOPY OF COTTONWOODS. THE COTTONWOOD CANOPY
<br />IS DEPICTED ON THIS PUN AND IS ASSOCIATED WITH
<br />OTHER RIPARIAN VEGETATION INCLUDING SHRUBS,
<br />GRASSES, FORBS, AND OTHER PERENNIAL PUNTS.
<br />JOB NO
<br />06015
<br />5/8/07
<br />APPLICANT:
<br />LAFARGE, NORTH AMERICA
<br />10170 CHURCH RANCH WAY, SUITE 200
<br />WESTMINSTER, CO 80021
<br />SCALE DRAWN BY
<br />1" =500' DRF
<br />3. OIL / GAS WELL LOCATION FROM COLORADO OIL AND GAS
<br />CONSERVATION COMMISSION GIS WEBSITE.
<br />4. TEMPORARY NATIVE GRASS SEED MIXTURE WILL BE USED
<br />AS A COVER CROP FOR ALL STOCKPILES TO REMAIN IN
<br />PLACE FOR ONE YEAR DR LONGER.
<br />5. WETLAND BUFFERS. THE OPERATOR WILL AVOID IMPACTS
<br />TO EXISTING WETLANDS. AS ILLUSTRATED, A SETBACK OF
<br />AT LEAST 25 FEET WILL BE MAINTAINED BETWEEN ALL
<br />MINING RELATED ACTIVITIES AND JURISDICTIONAL
<br />WETLANDS.
<br />6. ACCESS ROAD AND CONVEYOR. THE OPERATOR WILL
<br />MAINTAIN AN ACCESS ROAD AND CONVEYOR EQUIPMENT
<br />THROUGH THE APPROXIMATE CENTER OF THE MINED
<br />AREAS. ALIGNMENT MAY BE ADJUSTED AS MINING
<br />PROCEEDS TO ACCOUNT FOR VARIOUS MINING AND
<br />RECLAMATION ACTIVITIES.
<br />7. FRESHWATER POND. ALL STORKWATER FROM DISTURBED
<br />AREAS WILL BE DIRECTED TO THE FRESHWATER POND FOR
<br />DETENTION AND WATER QUALITY PURPOSES. THE
<br />FRESHWATER POND WILL ALSO CONTAIN ADEQUATE VOLUME
<br />TO STORE AND CLARIFY DEWATERING WATER PRIOR TO
<br />DISCHARGE.
<br />8. DEWATERING PROCESS. TRENCHES OR PIPES WILL BE USED
<br />TO CONVEY PUMPED WATER TO THE FRESHWATER POND
<br />FOR CLARIFICATION, THEN CONSUMPTIVE USE OR
<br />DISCHARGE. ALL DEPLETION OF GROUNDWATER WILL BE
<br />ACCOUNTED FOR BY A PUN OF AUGMENTATION OR
<br />SUBSTITUTE WATER SUPPLY.
<br />9. THE OPERATOR WILL STRIP AND STOCKPILE TOPSOIL AND
<br />OVERBURDEN FROM THE PROCESSING AREA PRIOR TO THE
<br />COMMENCEMENT OF MINING. RECOVERY OF MATERIAL
<br />WITHIN THE FOOTPRINT OF THE FRESHWATER POND WILL
<br />THEN TAKE PUCE, WITH SOME OVERBURDEN TO BE
<br />BACKFILLED TO ACHIEVE FUNCTIONAL GRADING WITH THE
<br />FRESHWATER POND.
<br />PLO PLAN MAP
<br />PROJECT:
<br />SUNDANCE
<br />SAND AND GRAVEL RESOURCE
<br />EL PASO COUNTY
<br />COLORADO
<br />BY
<br />REV
<br />BACK FILL OR SAND AND
<br />GRAVEL LEFT IN PUCE
<br />(SEE NOTE 2)
<br />
|