Laserfiche WebLink
Exhibit C -Mining Plan <br />Section #1 -Section #2 (see attached map). <br />Top 10" of Topsoil removed from Section #1 and stacked on Section #2. <br />Remaining dirt from Section # 1 removed and stacked in a separate pile on <br />Section #2.. <br />Rock to be ripped and pushed, (no blasting) from Section #1 by a Dozer <br />into a stoclk pile. <br />Dirt from pile on Section #2 replaced on Section #1. <br />Topsoil from pile on Section #2 replaced on Section #1. <br />Reverse process for mining Section #2. <br />Gravel to ~~e crushed from Coarse Stock Pile at various times, <br />(dependincl on availability of Crusher). <br />i ~ ~, .v'4 i ~..~ ~ . J~~< ~.. : 1 ~., ~ . ... .. a.. ,, . ~~ _ : tea si.~,> .._.. <br />Crushed Gravel to be stacked on permitted area and hauled when needed. <br />Approx. 3/a of permitted are will be mined, the other ~/4 will be used for <br />Gravel stockpiling. <br />Estimated ;start of Mining: <br />Spring --Summer of 200$ <br />Mining ~k Crushing will commence as need demands, <br />probable every two years for approx. 30 days at a <br />time. <br />Estimated closure of Pit and Reclamation complete by 2018. <br />