My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981025 (15)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981025
>
_INSPECTION - C1981025 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2020 5:33:19 AM
Creation date
4/8/2008 1:11:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
3/19/2008
Email Name
SB1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I11. COMMENTS - COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations <br /> made during the inspection. Comments in Section IV describe any enforcement actions <br /> taken during the inspection and the facts or evidence supporting the enforcement action. <br /> Page 1/1 North Thompson Creek C-81-025 <br /> 19 March 2008 ��� <br /> This was a complete inspection of the North Thompson Creek Mine conducted by Jim Stark of <br /> CDRMS. The mine has been reclaimed and the operator has applied for a final Phase III Bond Release <br /> (a termination of jurisdiction for the site). The Division is still considering this application. The <br /> weather was warm(mid 40's) and sunny and the ground was covered with snow. <br /> Availability of records: All of the necessary records were available at the Garfield County <br /> Courthouse in Glenwood Springs. See the records checklist at the end of this inspection for more <br /> details. <br /> The North Thompson Creek Mine site was still inaccessible due to snow at the time of the inspection. <br /> After getting stuck in the snow in the past at the site, it was decided to wait until the weather/ground <br /> conditions were moire amenable. The site will be checked over he next two months (April and May) <br /> and inspected once ground conditions allow. <br />
The URL can be used to link to this page
Your browser does not support the video tag.