My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-04_REPORT - M1988112
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1988112
>
2008-04-04_REPORT - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:27:00 PM
Creation date
4/7/2008 11:09:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
REPORT
Doc Date
4/4/2008
Doc Name
Spill incident report
From
ACS
To
File
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />%_ ..~ <br />~ _ DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 ) ~ ~ ~ ' ..~ <br />Z C O L O R A D O <br />t v t s[ o N o f <br />Denver, Colorado 80203 n <br />RECLAMATION <br />Phone: (303) 866-3567 ; ~ ~ <br />/; <br />C MI &NG <br />FAX: (303) 832-8106 ~ <br />. <br />~" <br /> SAFETY <br /> Bill Ritter, )r. <br /> Governor <br /> Harris D. Sherman <br /> Executive Director <br /> Ronald W. Cattany <br /> Division Director <br /> MEMO TO FILE Natural Resource Trustee <br />Date: April 4, 2008 ~" <br />Specialist: Allen Sorenson Signed: ~'~~ ~' <br />~ Inc./ <br />Subject/Operator/Operation/File No. Spill Incident Report/ Battle Mountain Resources, <br />San Luis Project/ Permit No. M-1988-112 /" <br />Type of Interaction: Meeting Phone Other <br />Person(s) contacted and affiliation: Bill Lyle BMRI 303-837-5852 <br />Summary and Resolution of Interaction: <br />Bill Lyle called at 2:39 p.m. on Apri14, 2008 to report a spill incident at the San Luis Project that occurred <br />during the afternoon of Apri13, 2008. The brine pipeline that runs from the water treatment plant at the <br />west pit to the tailing pond has been blocked. Battle mountain personnel were excavating around the line <br />with a backhoe and punctured the line. Approximately 300 gallons of brine flowed out of the puncture into <br />the trench that had been excavated. The hoe operator used the excavated soil to absorb the spill and <br />transported the soil to the tailing area. The brine contains sulfate and fluoride. The incident occurred <br />approximately 300 yards east of the west pit. The brine was contained to the excavated trench. <br />The Division has determined that the telephone report meets the requirements of Rules 8.2.1 and 8.2.2. <br />Battle Mountain Resources will provide the written report required under Rule 8.2.3 on Monday, April 7, <br />2008. <br />cc: Bill Lyle, BMRI, via email <br />Wally Erickson, DRMS, via email <br />Tony Waldron, DRMS, via email <br />David Bird, DRMS, via email <br />c:\acs files\My Documents 4-19-06 thru\battle mtn spill mtf.doc <br />Office of <br />Office of Active and Inactive Mines <br />Mined Land Reclamation Denver Grand Junction Durango <br />
The URL can be used to link to this page
Your browser does not support the video tag.