Laserfiche WebLink
<br />t ;. <br />Netiv Horizon one: 2007 Ve~efation Sampling for Phase 3 Bond Release <br />TABLE OF CONTEPtTS <br />SUMMARY 3 <br />1.0 PURPdSE 4 <br />2.0 PROCEDURES 5 <br />2.1 Study Areas 5 <br />2.2 Sampling Procedures . 5 <br />2.3 Statistical Procedures 6 <br />3A RESULTS: IRR{GATED PASTURE 7 <br />3.1 Irrigated Pasture Reference Area 7 <br />3.2 Irrigated Pasture Phase 3 Bond Release Area 7 <br />4.0 RESULTS: DRYLAND PASTURE 8 <br />4.1 Dryiand Pasture Reference Area 9 <br />4.2 Dryland Pasture Phase 3 Band Release Area. 9 <br />5.0 REFERENCES 11 <br />6.0 PREPARERS 11 <br />APPENDIX A: TABLES 12 <br />APPENDIX B: MAPS 14 <br />Bt0-Logfc S»vlranmental <br />t+iaremtrer 12, 2007 <br />Attachment 1-2 <br />